• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
王大江,梁海平,李文云,朱涛,赵川,顾雪平.扩展黑启动中恢复路径充电方式分析研究[J].电测与仪表,2015,52(1):.
WANG Da-jiang,LIANG Hai-ping,li wen yun,zhu tao,zhao chuan,gu xue ping.Research on Charging Model of Extended Black-start Scheme Recovery Path[J].Electrical Measurement & Instrumentation,2015,52(1):.
扩展黑启动中恢复路径充电方式分析研究
Research on Charging Model of Extended Black-start Scheme Recovery Path
DOI:
中文关键词:  扩展黑启动  充电方式  工频过电压  操作过电压  零起升压
英文关键词:extended black-start,charging model,power frequency overvoltage,switching overvoltage, voltage rising from zero
基金项目:国家自然科学基金项目(面上项目,重点项目,重大项目);国家教育部博士点基金
                 
作者中文名作者英文名单位
王大江WANG Da-jiang新能源电力系统国家重点实验室(华北电力大学)
梁海平LIANG Hai-ping新能源电力系统国家重点实验室(华北电力大学)
李文云li wen yun云南电力调度控制中心
朱涛zhu tao云南电力调度控制中心
赵川zhao chuan云南电力调度控制中心
顾雪平gu xue ping新能源电力系统国家重点实验室(华北电力大学)
摘要点击次数: 2108
中文摘要:
      大停电后快速可靠恢复是减小停电损失的重要措施,扩展黑启动策略是电力系统恢复的一种新的思路,但其启动网络比常规的只启动一台机组的黑启动方案更为复杂,为被启动机组送电时的路径充电过电压是影响机组成功启动的重要因素之一。为了获取合理的充电方式,本文在分析工频过电压和操作过电压产生机理及特性的基础上,以河北南网扩展黑启动方案为例,针对三种不同的充电方式分别搭建仿真模型进行分析研究,结果表明零起升压方式具有明显的优势,为以后的扩展黑启动工业试验及研究提供有益的参考。
英文摘要:
      Power system restoration in a rapid and reliable way after blackout is important measure to reduce loss, extended black-start strategy is a novel way for power system restoration, but the network to be restore are more complex than that of black-start strategy in which one generator is started,the over-voltage problem of restoration path when the units to be start are charging is one of the important factors that can affect units start successfully or not. In order to obtain the reasonable model of charging,in this paper,the mechanism and characteris of power frequency overvoltage and switching overvoltage were analysed,then extended black-start scheme of southern power system of Hebei province was taked for example,different simulation models corresponding to the three charging modes were builded respectively to study,the results show that voltage rising from zero approach has obvious advantages,the conclusion can provide useful reference for subsequent industrial trails and studies.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司