• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
傅利,周步祥,林虹江.基于混合变量动态优化算法的含风电电力系统多目标动态优化调度[J].电测与仪表,2015,52(10):.
FU Li,ZHOU Bu-xiang,LIN Hong-jiang.Dynamic Optimization Algorithm based on Hybrid Variable Containing Wind Power System Multi-Objective Dynamic Optimization Scheduling[J].Electrical Measurement & Instrumentation,2015,52(10):.
基于混合变量动态优化算法的含风电电力系统多目标动态优化调度
Dynamic Optimization Algorithm based on Hybrid Variable Containing Wind Power System Multi-Objective Dynamic Optimization Scheduling
DOI:
中文关键词:  NSGA-Ⅱ  旋转备用  混合变量动态优化算法  多目标动态优化调度  超前调度  
英文关键词:NSGA-Ⅱ  Spinning reserve  Hybrid variable dynamic optimization algorithm  Multi objective dynamic optimal dispatch  Ahead of schedule
基金项目:
        
作者中文名作者英文名单位
傅利FU Li四川大学电气信息学院
周步祥ZHOU Bu-xiang四川大学电气信息学院
林虹江LIN Hong-jiang四川大学电气信息学院
摘要点击次数: 1974
中文摘要:
      由于风电功率具有随机性、不确定性等特点,从系统安全稳定运行的角度出发,本文综合考虑了机组的故障停运、负荷与风电的预测偏差这三种不确定因素,将概率性旋转备用用解析式表达,并将其引入到考虑风电场电力系统多目标多时段的动态优化模型及约束条件中。基于 NSGA-II设计了一种 0-1 混合变量动态优化算法来求解该模型,该算法根据分层优化的方法处理整数混合变量,以达到同时实现机组启停与负荷分配的多目标优化;在求解过程中引入超前调度思想,对相邻时段约束耦合进行处理,从而实现多时段的动态优化调度。最后通过算例对模型进行仿真分析,仿真结果验证该模型的合理性和算法的有效可行性。
英文摘要:
      Because theSwind powerShas theScharacteristics ofSrandomness,Suncertainty,starting from theSsafe and stable operation of the systemSpoint of view,Sthis paper considers theSprediction biasSof load andSwind power and the faultSof units,establishesSan analytical expression of the probabilitySofSspinning reserve,Swhich was introduced into theSSmulti-objectiveSmulti period dynamic optimization model andSthe constraint conditionSin wind power systemS. Based on the NSGA - II ,the paper designes a mixed 0-1 variables of dynamic optimization Algorithm to solve the model. The algorithm base on hierarchical optimization method of mixed integer variables, in order to achieve at the same time realize the unit start-stop and load distribution of multi-objective optimization; The algorithm introduced ahead of schedule, the thought to adjacent coupling for processing time constraints, so as to realize the dynamic optimization of time scheduling. Finally through the case analysis on the simulation of the model, simulation results show feasibility and rationality of the model and algorithm of effective.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司