• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
初壮,李 晗,唐丽媛,任振宇.含光伏发电的配电网动态无功优化研究[J].电测与仪表,2015,52(17):.
CHU Zhuang,LI Han,TANG Li-yuan,RenZhen-yu.Dynamic reactive power optimization of distribution network with photovoltaic power station[J].Electrical Measurement & Instrumentation,2015,52(17):.
含光伏发电的配电网动态无功优化研究
Dynamic reactive power optimization of distribution network with photovoltaic power station
DOI:
中文关键词:  光伏发电  配电网  电容器组  静态无功优化  动态无功优化
英文关键词:photovoltaic power generations,capacitor group,distribution network,static reactive power optimization,dynamic reactive power optimization  
基金项目:
           
作者中文名作者英文名单位
初壮CHU Zhuang东北电力大学电气工程学院
李 晗LI Han东北电力大学电气工程学院
唐丽媛TANG Li-yuan包头市供电局
任振宇RenZhen-yu内蒙古电力公司
摘要点击次数: 1560
中文摘要:
      近些年光伏发电在配电网中得到大量的应用,但由于其出力带有一定的随机性,使得潮流优化结果不准确。为了能够在负荷变化的同时准确地优化含光伏发电的配电网潮流以降低网损,本文将一天内的光伏出力和负荷的变化分成24段,利用遗传算法将各时段进行静态潮流计算,利用动态规划法具有解决时间序列优化问题能力的特点,以各时段的网损值之和最小为目标函数,建立设备的动作时间表。为了避免运算复杂,简化运算的步骤,忽略无效的搜索路径同时也保证了电压稳定性。该方法的模型简单有效,且保证了电容器组的动作次数在约束限制下降低网损,减少电容器的损耗。通过算例结果表明本文运算方法可行有效,可达到预期目标。
英文摘要:
      In recent years a large number of photovoltaic power generations were applied in power distribution network, but the photovoltaic power station has the random output, leading to the inaccurate power flow optimization results. In order to be able to optimize the power flow of distribution network considering photovoltaic power generations with the change in load, in the paper we will divide the photovoltaic power and changeable load into 24 periods, use the genetic algorithm(GA) calculating the static reactive power optimization in the each period for getting power loss,utilize dynamic programming(DP) processing the ability of solving the problem of time sequence optimization, consider the minimum of power loss summation each period as the objective function, achieve the action time table of the control equipment. In order to avoid complex calculations, simplify the operation,ignoring the invalid search path but also ensuring voltage stability. The method is simple and effective model, satisfies the constraints the numbers of capacitors actions under the conditions of reducing the power loss, increases the life of the capacitors. Through numerical results show that the proposed method is feasible and effective operation, achieved the intended purpose.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司