• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
张秋雁,魏伟,李红斌.基于IEC61850标准的数字化电能表丢帧误差分析[J].电测与仪表,2016,53(24):.
Zhang Qiu Yan,Wei Wei,Li Hong Bin.Digital Watt-hour Meter Based on IEC61850 Standard Frame Loss Error Analysis[J].Electrical Measurement & Instrumentation,2016,53(24):.
基于IEC61850标准的数字化电能表丢帧误差分析
Digital Watt-hour Meter Based on IEC61850 Standard Frame Loss Error Analysis
DOI:
中文关键词:  数字化电能表  IEC61850  丢帧误差  数字化电能表误差  数字化电能计量系统
英文关键词:Digital watt-hour meter  IEC61850  frame loss error  Digital watt-hour meter error  Digital electricity metering system [中国南方电网公司科技项目(K-GZ2012-121)。 ]摘要:数字化电
基金项目:
        
作者中文名作者英文名单位
张秋雁Zhang Qiu Yan华中科技大学电气与电子工程学院
魏伟Wei Wei华中科技大学电气与电子工程学院
李红斌Li Hong Bin华中科技大学电气与电子工程学院
摘要点击次数: 1621
中文摘要:
      数字化电能表做为数字化电能计量系统中关键设备,其误差大小直接决定了数字化电能计量系统的准确度,数字化电能表在信号输入形式上与传统电能表存在很大的差异,传统电能表的输入信号为三相模拟电压/电流,而数字化电能表的输入信号为遵循IEC61850协议的数据帧,因此数字化电能表相对传统电能表而言存在一个重要的误差来源—丢帧误差。本文针对数字化电能表的丢帧误差从理论上进行分析,同时对确定等级的数字化电能表允许最大丢帧率进行了推导,并通过实验仿真验证,发现数字化电能表的丢帧误差在丢帧率一定的情况下随着丢帧序号的变化呈现出正弦变化的规律,且最大丢帧误差与采样频率无关。分析得出要忽略丢帧对数字化电能计量系统造成的误差时,数字化电能表允许的最大丢帧率应该在数字化电能表的准确度等级5%以下,且建立相关的丢帧测试项目对数字化电能表入网运行前进行检测具有重要意义。
英文摘要:
      As a key device of digital power metering system, The error of digital watt-hour meter directly determines the accuracy of the digital power metering system, digital watt-hour meter in signal input form have a lot of differences with traditional watt-hour meter, the input signal of traditional watt-hour meter is three-phase analog voltage/current and digital watt-hour meter is data frame that follow the IEC61850 protocol standard, so relative to traditional watt-hour meter the digital watt-hour meter have an important error source - frame loss error.In this paper analyzed theoretically the frame loss error of digital watt-hour meter, and derived the maximum allowed frame loss rate to digital watt-hour meter that determined level, at last, through experiment and simulation verification found that the frame loss error of digital watt-hour meter change with the number of lost frame, and the maximum loss error has nothing to do with the sampling frequency. Concluded that to ignore the digital power metering system loss error, digital watt-hour meter maximum allowable frame loss rate should below 5% of accuracy level, and it has a important significance to set up relevant surveillance project for digital watt-hour meter.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司