• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
赵深,孔晓峰,胡泰山,张博.特高压交流输电线路下方交跨线路感应电计算方法研究[J].电测与仪表,2017,54(13):.
Zhao Shen,Kong Xiaofeng,hutaishan,Zhang Bo.Research on calculation of Induced Voltage and Current on 110kV Crossing Transmission Lines under UHV AC Transmission Lines[J].Electrical Measurement & Instrumentation,2017,54(13):.
特高压交流输电线路下方交跨线路感应电计算方法研究
Research on calculation of Induced Voltage and Current on 110kV Crossing Transmission Lines under UHV AC Transmission Lines
DOI:
中文关键词:  特高压交流线路  交叉跨越  线路检修  感应电压  感应电流
英文关键词:UHV AC transmission lines  crossing  line maintenance  induced voltage  induced current
基金项目:
           
作者中文名作者英文名单位
赵深Zhao Shen国网浙江省电力公司金华供电公司
孔晓峰Kong Xiaofeng国网浙江省电力公司金华供电公司
胡泰山hutaishan武汉大学 电气工程学院
张博Zhang Bo武汉大学 电气工程学院
摘要点击次数: 1702
中文摘要:
      针对特高压交流线路下方交叉跨越的110kV线路停运检修时可能出现感应电,对检修人员人身安全造成威胁的问题,本文对浙江金华境内110kV交跨线路的感应电压和电流进行了现场实测,线路上产生的静电感应电压可达12.34kV。提出对被感应线路进行分段,利用matlab编程计算每一段的感应电压,最后叠加得到线路上感应电压的方法,计算结果表明:计算结果与实测结果非常接近,表明此种计算方法满足精度要求;交跨距离或交跨角度增大时,感应电压和电流会逐渐减小,实际工程中应尽量增大距离或角度,以减弱线路间的感应作用;为保证人身安全,线路检修时应将两侧变电站地刀接地,同时还需要在工作点两侧挂接临时接地线。
英文摘要:
      The induced electricity of 110kV transmission lines which cross the UHV AC transmission lines may threaten personal safety of the maintenance staff. In this paper, field measurement of the induced voltage and induced current on an 110kV crossing line inside Jinhua in Zhejiang province is performed. The electrostatic induced voltage on the measured line is 12.24kV. We put forward the method of induction line segments, using MATLAB program to calculate each section of induction voltage and finally the overlay get line induced voltage. The calculation results show that the calculated results and the measured results very close, indicates that this method can meet the requirements of precision; cross distance or cross angle increases, the induction voltage and current will decrease gradually, the engineering should try to increase the distance or angle, to weaken the line between the inductive effect. In order to ensure the safety of the people, Grounding knife switches in both sides of the substation should be grounded during line maintenance, and temporary ground wire should be connected to both sides of the working point.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司