• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
郑博文,杨隽,杨承辰,鲍小锋.主动配电网的全寿命周期分布式电源规划问题研究[J].电测与仪表,2018,55(8):66-71.
ZHENG Bowen,YANG Jun,YANG Chengchen,BAO Xiaofeng.Research on Distributed Generation Planning of Active Distribution Network Considering Life Cycle Cost[J].Electrical Measurement & Instrumentation,2018,55(8):66-71.
主动配电网的全寿命周期分布式电源规划问题研究
Research on Distributed Generation Planning of Active Distribution Network Considering Life Cycle Cost
DOI:
中文关键词:  主动管理  多目标双层规划  分布式电源  粒子群算法  
英文关键词:active  management, multi-objective  bi-level  planning, distributed  generation, improved  Particle Swarm  Optimization
基金项目:
           
作者中文名作者英文名单位
郑博文ZHENG Bowen玉溪供电局
杨隽YANG Jun玉溪供电局
杨承辰YANG Chengchen玉溪供电局
鲍小锋BAO Xiaofeng玉溪供电局
摘要点击次数: 1955
中文摘要:
      主动配电网的主动管理及主动控制特性加剧了其电源规划的难度。本文基于ADN特性提出了考虑主动管理模式的分布式电源多目标双层规划模型。上层模型以最小化系统电源侧的全寿命周期成本为目标,从而确定DG的安装配置方案;而下层则以最小化DG有功出力切除量为目标,通过采用主动管理中的DG出力控制、有载变压器分接头调节以及无功补偿装置调节等方式实现DG运行优化。利用带自适应变异的改进粒子群(IPSO)算法对上下层模型进行求解,提高了算法的求解速度并有效得到全局最优解。同时,通过对IEEE 33节点系统进行仿真分析,验证了所构建模型的合理性。
英文摘要:
      The key features of Active Distribution Network (ADN) which include active management and active control exacerbate the difficulty of its generation planning. Based on features of ADN, a multi-objective Bi-level programming model about distribution generation considering active management mode was proposed. The objective of upper level model was to minimize the total life cycle cost of power supply side in the system, thus the installation and configuration plan was obtained after optimization. Whereas the lower level model was aimed at minimizing active power curtailment value, and operation optimization of distributed generation (DG) was obtained through applying DG output control, on-load-tap-changing transformer adjustment, reactive power compensation device adjustment and other active management modes. The upper and lower model were solved by improved particle swarm optimization (PSO) algorithm with adaptive mutation, which could improve the solution speed and the global optimal effectiveness. Besides, the simulation of the IEEE 33-node system was carried out to verify the rationality of the model.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司