• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
李鹏飞,梁海平,顾雪平,田圣双,杨超,刘旭斐.考虑后效性的含直流落点系统黑启动方案研究[J].电测与仪表,2018,55(10):116-121.
Li Pengfei,Liang Haiping,Gu Xueping,Tian Shengshuang,Yang Chao,Liu Xufei.Research on black-start scheme of power system with DC terminal location considering aftereffects[J].Electrical Measurement & Instrumentation,2018,55(10):116-121.
考虑后效性的含直流落点系统黑启动方案研究
Research on black-start scheme of power system with DC terminal location considering aftereffects
DOI:
中文关键词:  直流落点  后效性  黑启动  多目标优化
英文关键词:DC  terminal location, aftereffects, early  stage restoration, multi-objective  optimization
基金项目:中央高校基本科研业务费专项资金资助
                 
作者中文名作者英文名单位
李鹏飞Li Pengfei华北电力大学 电气与电子工程学院
梁海平Liang Haiping华北电力大学 电气与电子工程学院
顾雪平Gu Xueping华北电力大学 电气与电子工程学院
田圣双Tian Shengshuang华北电力大学 电气与电子工程学院
杨超Yang Chao华北电力大学 电气与电子工程学院
刘旭斐Liu Xufei云南电力调度控制中心
摘要点击次数: 2154
中文摘要:
      本文在对高压直流通道传输能力与受端系统强度间关系进行分析的基础上,考虑受端交流系统网架覆盖程度与带电节点未恢复负荷总量对后期直流功率提升安全性与可行性的影响,设计了一种考虑后效性的含直流落点系统黑启动方案。以初期发电量加权和最大化、后期直流功率提升时系统运行尽可能安全可靠和直流功率迅速大幅提升可行性尽可能高为优化目标,综合考虑各类约束,结合混合粒子群算法与迪杰斯特拉(Dijkstra)算法求解出Pareto最优解集;然后利用三角模糊数和反熵权法确定主客观权重,采用基于模糊反熵权的修正理想解排序法(M-TOPSIS)对所得Pareto最优解进行排序来确定最满意的恢复方案。最后,通过含直流落点的新英格兰10 机39 节点系统算例验证了所提方法的有效性。
英文摘要:
      Based on the analysis of the relationship between the transmission capacity of the high-voltage direct current channel and the strength of the end-connect system, the influence of the coverage degree of the end-connected AC system and the total no-recovered load of the charged node on the safety and feasibility of the DC power increase in the late stage , this paper designs a black-start scheme of power system with DC terminal location considering aftereffects. The optimization goals are as follows: the total generation output in the early stage is as much as possible, the system operation is as safe and reliable as possible when the DC power is increased and the feasibility of DC power greatly rapid increase is as high as possible in the late stage. Then the mixed particle swarm optimization algorithm and Dijkstra algorithm are combined to solve the Pareto optimal solution set when all the constraints are taken into comprehensive consideration. Then triangular fuzzy number and anti-entropy method are used to determine subjective and objective weights, the Pareto optimal solution is sorted by the modified technique for order preference by similarity to ideal solution(M-TOPSIS) to determine the most satisfactory restoration scheme. In the end,effectiveness of the proposed method is validated by the optimization results on the New England 10-unit 39-bus power system with DC terminal.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司