• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
刘 迪,吕 林,刘继春,高红均,周春燕.考虑DG时序特性及负荷种类的微网电源容量与分时电价协同规划[J].电测与仪表,2018,55(12):45-53.
Liu Di,Lv Lin,Liu Jichun,Gao Hongjun,Zhou Chunyan.Coordinated planning of capacity of DG and TOU price consideringtiming characteristics of DG and types of load in microgrid[J].Electrical Measurement & Instrumentation,2018,55(12):45-53.
考虑DG时序特性及负荷种类的微网电源容量与分时电价协同规划
Coordinated planning of capacity of DG and TOU price consideringtiming characteristics of DG and types of load in microgrid
DOI:
中文关键词:  微网  分时电价  分布式电源  时序特性  响应特性  协同规划
英文关键词:microgrid, time-of-use (TOU) electricity  price, distributed  generation (DG), time-varying, response  characteristics, coordinated  planning
基金项目:四川省科技计划项目
              
作者中文名作者英文名单位
刘 迪Liu Di四川大学 电气信息学院
吕 林Lv Lin四川大学 电气信息学院
刘继春Liu Jichun四川大学 电气信息学院
高红均Gao Hongjun四川大学 电气信息学院
周春燕Zhou Chunyan四川大学 电气信息学院
摘要点击次数: 2160
中文摘要:
      合理配置微网内部各分布式电源容量,是保证微网实现就地消纳、自给自足的关键,而网内负荷一般与各电源额定出力存在时序上的差距,通过制定合理的分时电价策略能够在一定程度上减小该差距,基于此,文章提出了一种新的微网规划方法,即在规划阶段针对电源容量与分时电价进行协同规划。首先建立了针对不同种类电源、负荷的时序、响应模型,然后以各电源容量、分时电价为决策变量,以投资、运行成本等经济指标为目标函数,建立协同规划模型,运用线性优化商业软件进行求解,最后在算例中通过引入多种不同的常规规划方案进行对比,验证了该协同规划方案的优越性。
英文摘要:
      Reasonable allocation of the capacity of distributed generation(DG) in the microgrid, is the key to ensure the microgrid to achieve the purpose of local consumption and self sufficient. But,there is always a gap between the load and the rated power of DGs in the time-varying. To a certain extent, a reasonable time-of-use(TOU) price strategy can reduce the gap. This paper presented a new method of microgrid planning: coordinately planning the DGs'capacity and TOU electricity price during the planning phase. First, the model of DGs and load was established, considering the time-varying and response characteristics for different types. Then, coordinated planning model was presented, which takes the DGs'capacity and TOU electricity price as the decision variables, the operating cost and other economic indicators as the objective function, and was solved by the business software for linear programming. Finally, in the case study, the superiority of this coordinated planning method was verified by comparing with a variety of other conventional planning methods introduced.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司