It analysed a transformer protection false action which was caused by fault transformer low voltage merging unit in a 110kV substation. By testing and analysis of wave and merging unit structure, it was confirmed that the false action was caused by abnormal FPGA which caused that the Symbol bit of Sampling data became zero.Combining the analysis of accident, the hardware structure of merging unit was introduced.And its design faults was analysed.