• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
竺庆茸,李晗,李先允,王书征.含光伏的主动配电网非对称故障条件下对并网点电压影响的研究[J].电测与仪表,2019,56(4):101-106.
Qingrong Zhu,Han Li,Xianyun Li,Shuzheng Wang.Research on active distribution network and network effects on non symmetrical voltage fault conditions with PV[J].Electrical Measurement & Instrumentation,2019,56(4):101-106.
含光伏的主动配电网非对称故障条件下对并网点电压影响的研究
Research on active distribution network and network effects on non symmetrical voltage fault conditions with PV
DOI:
中文关键词:  不对称故障  分布式电源  中性点电压击穿  并网点电压
英文关键词:asymmetric faults, distributed power supplies, neutral point voltage breakdown, point of common coupling
基金项目:江苏省普通高校研究生科研创新计划项目(SJZZ16_0291)
           
作者中文名作者英文名单位
竺庆茸Qingrong Zhu1.南京工程学院
李晗Han Li1.南京工程学院
李先允Xianyun Li1.南京工程学院
王书征Shuzheng Wang1.南京工程学院
摘要点击次数: 1426
中文摘要:
      对于地区二次变电站其中性点一般不直接接地,随着高密度分布式电源的接入,若输电线路发生接地故障,会导致该变压器中性点电压升高,甚至会击穿,进一步影响并网点电压。本文针对含光伏的主动配电网,分析了主变中性点击穿前后、线路保护动作前后,影响并网点电压的主要因素,并画出含光伏的主动配电网的各序网络图,推导光伏电源并网点电压理论计算公式,同时,本文通过PSCAD仿真验证了公式的正确性,比较了主变中性点击穿前后,分布式电源并网点电压变化规律。
英文摘要:
      For a typical radiation type 220-110-10kV grid, the neutral point of the 110kV side transformer is a direct grounding system, but not the neutral point of each transformer is directly grounded. If the ground fault occurs on the 110kV transmission line, the neutral point voltage of the 110kV transformer will rise. Even the neutral point voltage breakdown will happen. This article will draw out the sequence network including photovoltaic power and calculate formula of distributed power and network voltage theory. Aiming at the typical power grid, respectively the main changes from the neutral breakdown occurred will be discussed at the same time. By analyzing the formula, the main factors affecting the voltage are obtained. The conclusion is of practical value. At the same time, the accuracy of the conclusion is verified by PSCAD simulation. The distributed power and the operation of point voltage are compared considering work condition of the main transformer.#$NLKeywords: asymmetric faults, distributed power supplies, neutral point voltage breakdown, point of common coupling
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司