吴俊杰,陈程,程林,江翼,韩钦,冯亮.基于模糊综合评价法的智能变电站二次设备状态评价研究[J].电测与仪表,2018,55(8):72-76. Wu Junjie,Chen Cheng,Cheng Lin,Jiang Yi,Han Qin,Feng Liang.Study on state evaluation of two equipment in intelligent substation based on fuzzy comprehensive evaluation method[J].Electrical Measurement & Instrumentation,2018,55(8):72-76.
基于模糊综合评价法的智能变电站二次设备状态评价研究
Study on state evaluation of two equipment in intelligent substation based on fuzzy comprehensive evaluation method
In view of the lack of comprehensive and effective performance testing and simple and reliable evaluation methods for the two equipments in the smart substation, this paper lists some factors that affect the accurate evaluation of the two equipment performance in the Smart Substation, and compares the important characteristics of commonly used assessment methods, it is concluded that the fuzzy comprehensive evaluation method is more accurate for the secondary equipment of intelligent substation.The calculation steps are given, and the effectiveness and reliability of the method are verified by an example.