• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
黄悦华,李孟凡,程江洲.基于可靠性分析的智能变电站巡检周期计算方法[J].电测与仪表,2019,56(19):31-36.
HUANG Yuehua,LI Mengfan,CHENG Jiangzhou.An Calculation Method of Inspection Cycle Based on Reliability Analysis in Intelligent Substation[J].Electrical Measurement & Instrumentation,2019,56(19):31-36.
基于可靠性分析的智能变电站巡检周期计算方法
An Calculation Method of Inspection Cycle Based on Reliability Analysis in Intelligent Substation
DOI:
中文关键词:  智能变电站  IEC 61850  故障树分析  可靠性  巡检周期
英文关键词:intelligent  substation, IEC 61850, FTA, reliability, inspection  cycle
基金项目:国家重大科技专项
        
作者中文名作者英文名单位
黄悦华HUANG Yuehua三峡大学电气与新能源学院
李孟凡LI Mengfan三峡大学电气与新能源学院
程江洲CHENG Jiangzhou三峡大学电气与新能源学院
摘要点击次数: 1443
中文摘要:
      针对目前智能变电站巡检周期确定过度依赖经验,缺乏理论支撑的问题,本文提出一种基于可靠性分析的智能变电站巡检周期计算方法,并以基于IEC 61850标准的3/2主接线方式变电站为例进行介绍。首先由故障树分析(FTA)得到导致变电站系统故障的设备最小割集。然后通过可能故障点与相关设备间的逻辑联系,以及从历史文献中得到各种设备的原始可靠性数据(可用率、不可用率、失效率),计算可能故障点的可靠性数据。再利用层次分析法得到可用率、不可用率、失效率三类可靠性数据的权重关系,经过赋权计算得出可能故障点的任务可靠度。最后通过任务可靠度与巡检周期的函数关系,得到可能故障点的巡检周期。因为该方法将各类设备的可靠性数据转化为可能故障点的可靠度,因此更能满足巡检周期计算的实际需要,对保障智能变电站安全稳定运行有着重要意义。
英文摘要:
      According to the fact that intelligent substation inspection cycle calculation is over-reliant on experience and lack of theoretical support, an calculation method of inspection cycle based on reliability analysis in intelligent substation is proposed. The method is discussed on an intelligent substation based on IEC 61850 with a breaker-and-a-half configuration. Firstly, the minimum cutting set of the equipment that causes the failure of the substation system is obtained through Fault Tree Analysis (FTA). Secondly, through the logical connection between the possible fault-point and the relevant equipments, combining with the original reliability data of various devices (availability, unavailability, failure rate) from the related literatures,the reliability data of possible fault-point is obtained.Thirdly, using the Analytic Hierarchy Process to obtain the weight relationships of three types of reliability data, the reliability of the possible fault-point is calculated after weighted calculation. Finally, through the function relationship between the task reliability and the inspection cycle, the inspection cycle of possible fault-point is obtained. Because this method converts the reliability data of various equipments into the reliability of possible fault-point, it can more effectively meet the actual needs of the cycle calculation and is of great significance in ensuring the safe and stable operation of intelligent substations.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司