• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
单福州,李晓露,宋燕敏,周海明,刘超群.基于改进两阶段鲁棒优化的区域综合能源系统经济调度[J].电测与仪表,2018,55(23):103-108.
Shan Fuzhou,Li Xiaolu,Song Yanmin,Zhou Haiming,Liu Chaoqun.Economic dispatching of regional integrated energy system based on improvement two-stage robust optimization[J].Electrical Measurement & Instrumentation,2018,55(23):103-108.
基于改进两阶段鲁棒优化的区域综合能源系统经济调度
Economic dispatching of regional integrated energy system based on improvement two-stage robust optimization
DOI:
中文关键词:  区域综合能源系统  不确定性  改进鲁棒优化  经济调度
英文关键词:regional  integrated energy  system, uncertainty, improvement  robust optimization, economic  dispatch
基金项目:国网科技项目“全球能源互联网实验研究平台”(JS71-16-006)
              
作者中文名作者英文名单位
单福州Shan Fuzhou上海电力学院电气工程学院
李晓露Li Xiaolu上海电力学院电气工程学院
宋燕敏Song Yanmin中国电力科学研究院有限公司
周海明Zhou Haiming中国电力科学研究院有限公司
刘超群Liu Chaoqun中国电力科学研究院有限公司
摘要点击次数: 2237
中文摘要:
      针对光伏出力及负荷的不确定性对系统日前经济调度和实时运行的影响,提出了一种以期望场景下最优,任意场景下可行的改进两阶段鲁棒优化方法,解决经典两阶段鲁棒优化存在的保守性问题。建立一种考虑可再生能源和负荷波动的区域综合能源系统改进两阶段鲁棒优化经济调度模型,通过列约束生成算法将目标函数分解为主问题和子问题进行反复迭代求解。模型第一阶段(主问题)以日前经济调度成本为目标函数,制定出包含系统设备出力、天然气供气计划的日前调度方案。在此基础上,第二阶段(子问题)以实时运行下调整成本为目标函数,通过调整设备出力应对系统中不确定波动。最后,以冬季某区域综合能源系统进行算例仿真,验证模型的有效性。#$NL关键词:区域综合能源系统;不确定性;改进鲁棒优化;经济调度
英文摘要:
      In view of the impact of the uncertainty of PV output and load on the day-ahead economic dispatch and real-time operation of the system, an improvement two-stage robust optimization method is proposed, which is optimal under the ideal scenario and feasible in any scenario and solving the conservative problem of classical two-stage robust optimization. An improvement two-stage robust optimization economic dispatching model for regional integrated energy systems considering renewable energy and load fluctuations is established, the column constraint generation algorithm is used to decompose the objective function into main problems and sub-problems. The first stage of the model (the main problem) takes the day-ahead economic dispatching cost as the objective function, and formulates a day-ahead dispatching plan including the system equipment output and the natural gas supply plan. On this basis, the second stage (sub-problem) takes the adjustment cost in real-time operation as the objective function, and adjusts the equipment output to cope with the uncertain fluctuations in the system. Finally, the simulation of a integrated energy system in a certain area in winter is carried out to verify the validity of the model.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司