• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
陈波,王玉麟,辛建波,周宁,舒展,苏永春.抽水蓄能机组全工况试验条件下最大进相能力分析[J].电测与仪表,2020,57(9):65-71,102.
Chen Bo,Wang Yulin,Xin Jianbo,Zhou Ning,Shu Zhan,Su Yongchun.Research on leading power factor depth limit of pumped storage units in leading power factor test with all working conditions[J].Electrical Measurement & Instrumentation,2020,57(9):65-71,102.
抽水蓄能机组全工况试验条件下最大进相能力分析
Research on leading power factor depth limit of pumped storage units in leading power factor test with all working conditions
DOI:10.19753/j.issn1001-1390.2020.09.010
中文关键词:  抽水蓄能机组  进相试验  发电工况  抽水工况  最大进相能力
英文关键词:pumped  storage units, leading  power factor  test, generation  mode, pumping  mode, leading  power factor  depth limit
基金项目:江西省重点研发计划项目(20171BBE50017)
                 
作者中文名作者英文名单位
陈波Chen Bo国网江西省电力有限公司电力科学研究院
王玉麟Wang Yulin南昌大学 信息工程学院
辛建波Xin Jianbo国网江西省电力有限公司电力科学研究院
周宁Zhou Ning国网江西省电力有限公司电力科学研究院
舒展Shu Zhan国网江西省电力有限公司电力科学研究院
苏永春Su Yongchun国网江西省电力有限公司电力科学研究院
摘要点击次数: 1421
中文摘要:
      依据同步发电机进相试验导则,提出了计及发电机功角、定子电流和机端电压三大约束因素的抽水蓄能机组最大进相能力计算方法,全面分析了发电和抽水工况下机组的最大进相能力,研究了升压变分接头档位对全工况试验条件下机组最大进相能力的影响。以洪屏抽蓄电站#1机组为算例,绘制了机组最大进相能力随系统电压和有功出力变化的Q-PV三维曲面,任意进相试验工况下机组的最大进相能力均能与曲面中的某点相对应。试验人员通过查表即可准确掌握机组全工况下的最大进相能力,并了解当前进相深度是否满足试验要求,大大提高试验机组最大进相能力评估的准确性。试验实测数据与理论计算结果基本一致,验证了所提分析方法的正确性和实用性。
英文摘要:
      According to guide on leading power factor operation test of synchronous generator, a capability calculation method of pumped storage unit considering constraints with generator power angle, stator current and machine terminal voltage is proposed. Leading power factor depth limit under generation mode and pumping mode is overall analysed,and the tap changer stalls affecting on the leading power factor depth limit is also studied.Taking # 1 generator of Hongping Pumping Station as example, the Q-PV three-dimensional surface of leading power factor depth limit changing with the system voltage and active power are showed in the picture, leading power factor depth limit of any test condition can correspond to a point in the surface. The test personnel can accurately grasp the leading power factor depth limit under all test conditions through the three-dimensional surface, which can greatly improve the accuracy of leading power factor depth limit assessing.The experimental data are basically consistent with the theoretical calculation results, which validates the correctness and practicability of the proposed method.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司