• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
刘晋源,吕林,高红均,李成鑫,石文超,冯智慧.促进电动汽车和清洁能源发展的充/换电站-风-光-储协调规划[J].电测与仪表,2020,57(1):89-98.
Liu Jinyuan,lvlin,gaohongjun,lichengxin,Shi Wenchao,FengZhihui.Charging\Swapping Station-Wind-Photovoltaic-Storage Planning to promote the development of electric vehicles and clean energies[J].Electrical Measurement & Instrumentation,2020,57(1):89-98.
促进电动汽车和清洁能源发展的充/换电站-风-光-储协调规划
Charging\Swapping Station-Wind-Photovoltaic-Storage Planning to promote the development of electric vehicles and clean energies
DOI:10.19753/j.issn1001-1390.2020.001.012
中文关键词:  路网节点  配电网  电池更换站  集中充电站  分布式电源
英文关键词:road network, distribution network, battery swap stations, centralized charging station, distributed generation
基金项目:国家自然科学基金项目(51807125),中央高校基本科研业务费专项基金资助项目(YJ201750)
                 
作者中文名作者英文名单位
刘晋源Liu Jinyuan四川大学
吕林lvlin四川大学
高红均gaohongjun四川大学
李成鑫lichengxin四川大学
石文超Shi Wenchao四川大学
冯智慧FengZhihui四川大学
摘要点击次数: 1900
中文摘要:
      在电动汽车和清洁能源快速发展的背景下,提出一种考虑充电模式的路网、电网相结合充\换电站-风-光-储三阶段规划方法。首先根据车流量和土地价格,并充分考虑服务质量,以土地成本、换电设施成本和换电距离成本三者之和最小为目标函数,对电池更换站进行规划;其次在换电站规划基础之上,综合考虑土地成本、电池成本及其运输距离成本之和最优,确定集中充电站的数量及位置;最后根据充电站的数量及分布并着重考虑其充电模式,计及风光不确定性和时序特性,应用随机场景预测风光出力,以风-光-储的投资成本和运行成本为综合优化目标,同时考虑二阶锥松弛潮流约束、安全约束等,对风-光-储定容选址。最后通过算例分析换电站的服务能力、土地价格和充电模式对规划的影响,验证了本文规划方法的有效性。
英文摘要:
      Under the background of the rapid development of electric vehicles(EVs) and distributed generations(DGs), combining road network and distribution network,a three-stage planning method of electric vehicle battery charge\swap station- wind-photovoltaic-storage is proposed. Firstly, the battery swap station (BSS) is planned according to the traffic flow of EVs and land price, and the service quality is fully considered. The objective function is to minimize the sum of the land cost, battery swap device cost and switching distance cost. Secondly, based on the results of battery swap station, the quantity and location of the centralized charging stations (CSs) are determined by taking the minimum sum of land cost, battery cost and transportation distance cost into consideration. Thirdly, according to the quantity and distribution of charging stations, the charging mode of centralized charging stations is mainly considered, taking into account the uncertainty and time-varying characteristics of wind-light, and the output of wind turbine generation (WTG) and photovoltaic generation (PVG) are predicted by using the random scene. The investment cost and operation cost of wind-light-storage are taken as the comprehensive optimization objective. Meanwhile, the wind-light-storage capacity and location are selected by considering the second-order cone slack flow constraint and safety constraint and so on. Finally, the battery swap station service quality, land price and charging mode on this planning are analyzed through examples, and the effectiveness of the planning method in this paper is verified.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司