• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
杨里,丁智华,林纲,刘荆芹.冷热电联供微电网的网络损耗优化调度策略[J].电测与仪表,2020,57(7):74-81.
YANG Li,DING Zhihua,LIN Gang,LIU Jingqin.Optimization of network loss scheduling strategy for thermal-electric power supply microgrid[J].Electrical Measurement & Instrumentation,2020,57(7):74-81.
冷热电联供微电网的网络损耗优化调度策略
Optimization of network loss scheduling strategy for thermal-electric power supply microgrid
DOI:10.19753/j.issn1001-1390.2020.07.012
中文关键词:  冷热电联供微电网  需求侧管理  混沌粒子群算法  随机机会约束规划  能量优化调度  
英文关键词:CCHP microgrid  demand side management  chaotic particle swarm optimization  stochastic chance constrained programming  optimal operation  
基金项目:
           
作者中文名作者英文名单位
杨里YANG Li国网福建省电力有限公司
丁智华DING Zhihua国网福建省电力有限公司
林纲LIN Gang国网福建泉州供电公司
刘荆芹LIU Jingqin国网福建省电力有限公司
摘要点击次数: 1689
中文摘要:
      针对冷热电联供微电网的能量优化调度问题中存在的不确定性,计及风力发电和光伏发电的不确定性,采用随机机会约束规划模型进行建模。以机会约束形式的系统综合运行成本为目标函数,计及功率平衡约束等必要的约束条件,建立基于随机机会约束规划模型的冷热电联供微电网能量优化调度模型。所建立的模型能够充分考虑系统并网的风力发电和光伏发电出力的不确定性,所制定的能量优化调度方案是基于风光出力的随机分布的,因此更具备全局性,经济型。仿真算例表明,并网模式下的系统运行成本要显著低于离网模式下的,同时通过模型能够给出能量优化调度方案制定过程中系统成本高低和风险的关系,从而为决策者提供参考。
英文摘要:
      Considering the uncertainty of wind power generation and photovoltaic generation, the stochastic chance constrained programming model was used to construct the optimal operation model of CCHP microgrid. Taking the chance constrained form of comprehensive system operation cost as objective function and taking into account the necessary constraints of power balance constraints, a model based on stochastic chance constrained programming was proposed for optimal operation of CCHP microgrid. The proposed model can take full account of the uncertainty of the wind power and photovoltaic power output in the system, thus the optimized operation scheme is based on the random distribution of the wind and scenery, so it is more global and economic. The simulation example shows that the operating cost of the system under the grid connected mode is significantly lower than that under the grid off mode. Through the model, the relationship between the cost of the system and the risk in the process of optimizing the operation scheme can be given, so as to provide a reference for the decision-makers.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司