• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
杨玉龙,王子善,杨震,梁峻峰.考虑风电不确定性的蓄热式电采暖消纳弃风经济性分析[J].电测与仪表,2020,57(13):47-54.
Yang Yulong,Wang Zishan,Yang Zhen,Liang Junfeng.Day-ahead Economic Analysis of Electric Heating with Storage System for Heating Considering the Uncertainty of Wind Power[J].Electrical Measurement & Instrumentation,2020,57(13):47-54.
考虑风电不确定性的蓄热式电采暖消纳弃风经济性分析
Day-ahead Economic Analysis of Electric Heating with Storage System for Heating Considering the Uncertainty of Wind Power
DOI:10.19753/j.issn1001-1390.2020.13.009
中文关键词:  风电预测误差  供给价格弹性  热负荷  储热装置  弃风
英文关键词:wind power prediction error  price elasticity of supply  thermal load  storage device for heating  wind power curtailment
基金项目:2017国家电网公司总部科技项目(2017GW-20)。
           
作者中文名作者英文名单位
杨玉龙Yang Yulong东北电力大学 电气工程学院
王子善Wang Zishan东北电力大学 电气工程学院
杨震Yang Zhen东北电力大学 电气工程学院
梁峻峰Liang Junfeng国网吉林供电公司变电二次检修室
摘要点击次数: 1949
中文摘要:
      针对冬季采暖期我国北方地区严重弃风和燃煤导致的空气污染问题,综合考虑风电预测误差及供给价格弹性,以采暖期系统运行成本最小为优化目标,构建基于终端热负荷特性的电锅炉日前优化调度模型,并在电力市场背景下分析了蓄热式电采暖供暖系统的运行经济性。通过引入储热装置来更加合理的利用各时段弃风电量,从而进一步提高供热系统运行经济性。在求解阶段,采用CPLEX软件包下的分支定界法(BBA)对模型求解,并通过具体算例仿真结果验证了所提方法的有效性。
英文摘要:
      In order to solve these issues that severe abandonment of wind and air pollution caused by coal combustion in North China during winter heating period, considering the forecast error of wind power and price elasticity of supply, a electric boiler pre-day optimal scheduling model based on terminal heat load characteristics is constructed by taking the minimum operation cost of the heating system as the optimization objective function and the operation economy of electric heating system with storage system for heating is analyzed under the background of electricity market. Through the introduction of heat storage device to make more reasonable use of the wind power curtailment in all periods, the operation economy of the heating system is further improved. In solving stage, branch and bound algorithm (BBA) based on CPLEX software is used to solve the model, and the effectiveness of the proposed method and model is verified by the simulation results of a certain example.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司