• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
李付永,张 帆,李海涛,孙龙勇,姚灿江.相控断路器选相关合问题分析及应用研究[J].电测与仪表,2019,56(9):141-147.
Li Fuyong,Zhang Fan,Li Haitao,SUN Longyong,YAO Canjiang.The Analysis on Making Operation in Phase Selection of Phase-controlled Circuit Breaker and its Application and Research[J].Electrical Measurement & Instrumentation,2019,56(9):141-147.
相控断路器选相关合问题分析及应用研究
The Analysis on Making Operation in Phase Selection of Phase-controlled Circuit Breaker and its Application and Research
DOI:
中文关键词:  选相合闸技术  选相关合  预击穿  实际合闸时间  预期合闸时间
英文关键词:Phase selection closing technology  phase selection making  prebreakdown  active close time  anticipated closing time
基金项目:
              
作者中文名作者英文名单位
李付永Li Fuyong河南平高电气股份有限公司
张 帆Zhang Fan河南平高电气股份有限公司
李海涛Li Haitao南京南瑞继保电气有限公司
孙龙勇SUN Longyong河南平高电气股份有限公司
姚灿江YAO Canjiang河南平高电气股份有限公司
摘要点击次数: 1826
中文摘要:
      选相合闸技术能大大降低断路器合闸操作过程中的暂态过电压和涌流,提高电力设备寿命及电力系统的稳定性,在超、特高压系统中得到了大力发展和应用。伴随着应用增多、挂网运行时间增长,提前预击穿、过电压/涌流增大等选相关合问题时常发生。以相控断路器为研究对象,针对其在选相关合过程中出现的问题,采用理论分析及试验验证方法,结合选相控制技术的基本理论和原理进行了原因分析。实际合闸时间偏离预期合闸时间较大是导致相控断路器选相关合问题发生的根本原因。
英文摘要:
      Phase selection making technology can greatly reduce transient over voltage and inrush current in the closing operation of circuit breaker, improve endurance of power equipment and stability of electric power system and have been rapidly developed and applied in ultra-high and extra-high voltage system. With its increased application and network operation, phase selection problems occurred frequently such as prebreakdown, overvoltage/inrush current. Phase-controlled circuit breaker is taken as the research object. Aiming at the problems in the process of phase selection and combination, theoretical analysis and experimental verification methods are adopted. The reasons are analyzed by combining the basic theory and principle of phase selection control technology. It is considered to be the fundamental reason to cause making operation in phase selection of phase-controlled circuit breaker that actual closing time t deviates greatly from expected closing time T. The mutual change between anticipated closing time T and active closing time is the fundamental reason to cause phase selection problem.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司