• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 社长及主编
    • 期刊荣誉
  • 编委会
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
马浩,贺朝会,王立斌,杨鹏,申洪涛,陶鹏.基于用电信息采集大数据的公变负载状态评估[J].电测与仪表,2020,57(14):99-105.
MA Hao,HE Chaohui,WANG Libin,YANG Peng,SHEN Hongtao,TAO Peng.Load assessment of public transformer based on power consumption information acquisition and big data[J].Electrical Measurement & Instrumentation,2020,57(14):99-105.
基于用电信息采集大数据的公变负载状态评估
Load assessment of public transformer based on power consumption information acquisition and big data
DOI:10.19753/j.issn1001-1390.2020.14.017
中文关键词:  配电网公用变压器  负载状态  Hadoop  大数据  综合评价法  模糊判断矩阵
英文关键词:distribution network public transformer, load condition, Hadoop, big data, comprehensive evaluation method, fuzzy judgment matrix
基金项目:
                 
作者中文名作者英文名单位
马浩MA Hao西安交通大学
贺朝会HE Chaohui西安交通大学
王立斌WANG Libin国网河北省电力有限公司
杨鹏YANG Peng国网河北省电力有限公司电力科学研究院
申洪涛SHEN Hongtao国网河北省电力有限公司电力科学研究院
陶鹏TAO Peng国网河北省电力有限公司电力科学研究院
摘要点击次数: 1741
中文摘要:
      摘要:配电网公用变压器是电力系统中数量庞大且又关键的设备,由于电力需求波动等条件影响,其负载情况变化较大。为能够快速地对其负载状态进行准确评价,文中首先介绍了基于Hadoop CDH的大数据分析平台,其次基于用电信息采集大数据提出了公用变压器负载状态的评估方法。该方法在合理运用综合评价法的同时,通过历史统计数据确定模糊判断矩阵进而求解权重,克服了主观因素的影响。在评估公用变压器重过载、轻空载、负载波动状态的基础上,进行变权重加权求和,最终确定变压器的负载状态。本方法计算结果合理,过程清晰。在公用变压器精准投资、运行监控检修、投资后评估等方面具有重要的辅助决策作用。
英文摘要:
      Abstract:Distribution network public transformer is a key equipment in the power system, and its quantity is very large. Due to power demand fluctuations and other conditions,public transformer’s load is in the great changes. In order to?evaluate each public transformer more accurately,this paper introduces the big data analysis platform based on Hadoop CDH,then proposes a method of public transformer load condition evaluation based on electricity big data.The method determines the fuzzy judgment matrix by historical statistics data,calculates weight by this matrix and overcomes the defects of subjective factors when using comprehensive evaluation method.After evaluating the condition of heavy overload,light load and load fluctuation,it calculates the weighted sum of each condition,and finally determines the load status of each public transformer.The process is clear, and the calculation result is accurate and has an important supporting decision-making role in the field of precision investment,operation,maintenance and post-investment assessment.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 社长及主编
    • 期刊荣誉
  • 编委会
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司