• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
孙建锋,徐云飞,周哲,李卫国,徐永海.C-MMC型电力电子变压器直流故障分析与保护方法研究[J].电测与仪表,2020,57(17):123-128.
Sun Jianfeng,Xu Yunfei,Zhou Zhe,Li Weiguo,Xu Yonghai.Study on DC fault analysis and protection method of C-MMC based power electronic transformer[J].Electrical Measurement & Instrumentation,2020,57(17):123-128.
C-MMC型电力电子变压器直流故障分析与保护方法研究
Study on DC fault analysis and protection method of C-MMC based power electronic transformer
DOI:10.19753/j.issn1001-1390.2020.17.019
中文关键词:  电力电子变压器  直流故障  过电压  延时闭锁
英文关键词:power  electronic transformer, DC  fault, overvoltage, delay  blocking
基金项目:国家电网公司科技项目
              
作者中文名作者英文名单位
孙建锋Sun Jianfeng国家电网有限公司
徐云飞Xu Yunfei先进输电技术国家重点实验室全球能源互联网研究院有限公司
周哲Zhou Zhe先进输电技术国家重点实验室全球能源互联网研究院有限公司
李卫国Li Weiguo先进输电技术国家重点实验室全球能源互联网研究院有限公司
徐永海Xu Yonghai新能源电力系统国家重点实验室华北电力大学
摘要点击次数: 1560
中文摘要:
      对模块化多电平换流器 (Modular Multilevel Converter,MMC)型电力电子变压器的拓扑结构及实现原理进行介绍。分析了在采用半桥子模块的MMC中发生中压直流母线双极短路故障后的电流流通路径,以及其不能实现直流故障闭锁的原因。为解决上述问题,选取箝位双子模块代替半桥模块,并分析了其故障电流流通路径和故障闭锁原理。但由于箝位双子模块在直流故障闭锁后可能出现子模块过电压问题,为此,提出了电力电子变压器隔离级延时闭锁的策略,并分析了MMC闭锁后在该策略下隔离级闭锁前的故障电流流通路径。最后,通过PSCAD仿真平台对箝位双子模块的闭锁功能和隔离级延时闭锁策略进行了仿真验证。
英文摘要:
      The topological structure and implementation principle of modular multilevel converter (MMC) based power electronic transformer were introduced. The current path of the MMC with half bridge sub module in the presence of medium voltage DC bus double pole short circuit fault, and the reason why it can not achieve DC fault blocking were analyzed. In order to solve the above problems, the clamp double sub-module was selected to replace the half bridge sub module, and the fault current path and the fault blocking principle were analyzed. However, after the DC fault blocked, the overvoltage of the clamp double sub-module may occur. For this reason, the delay isolation strategy of isolated stage for power electronic transformer was put forward, and the fault current path before isolation and after MMC blocked was analyzed. Finally, the blocking function of clamp double sub-module and isolation level delay blocking strategy were simulated and verified by PSCAD simulation platform.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司