• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
张兴忠,杨罡,赵国伟.基于全域电力大数据的配电网现状自动诊断分析技术研究*[J].电测与仪表,2019,56(16):111-115.
ZhangXingzhong,Yang Gang,赵国伟.Research on Automatic Diagnosis and Analysis Technology of Distribution Network Status Based on Global Large Power Data[J].Electrical Measurement & Instrumentation,2019,56(16):111-115.
基于全域电力大数据的配电网现状自动诊断分析技术研究*
Research on Automatic Diagnosis and Analysis Technology of Distribution Network Status Based on Global Large Power Data
DOI:10.19753/j.issn1001-1390.2019.016.018
中文关键词:  全域电力大数据  配电网  CIM模型  拓扑  诊断分析
英文关键词:Global power grid data  Distribution network  CIM model  topology  Diagnostic analysis
基金项目:山西省重点研发计划项目(201803D31041); 国网山西省电力公司科技项目(52053017000N);
        
作者中文名作者英文名单位
张兴忠ZhangXingzhong太原理工大学
杨罡Yang Gang国网山西省电力公司电力科学研究院 山西 太原
赵国伟赵国伟
摘要点击次数: 1257
中文摘要:
      本文在考虑地区电网实际的基础上,对配电网生产管理系统、电网调度自动化系统、用户用电信息采集系统、气象信息系统以及全业务数据中心的配电网数据进行深度挖掘,提出了基于CIM的配电线路拓扑结构图重构方法,并提出了对中、低压配电网的现状自动进行诊断分析的具体思路和实施步骤。并针对配电网存在的线路分段过多、网架冗余问题、供电半径过大等主要问题,提出了配电网自动诊断分析的具体方法及实施步骤。并以某市电网进行实例计算分析,列举了配电网现状自动诊断分析结果,获得了与一流配电网目标之间的差距,验证了本文所提出的配电网现状自动诊断分析方法的有效性。
英文摘要:
      On the basis of considering the actual situation of regional power grid, this paper deeply excavates the distribution network data of production management system, dispatching automation system, user power information acquisition system, meteorological information system and full-service data center of distribution network, puts forward the reconfiguration method of distribution line topology based on CIM, and puts forward the automatic implementation of the status quo of medium and low voltage distribution network. The specific thinking and implementation steps of diagnostic analysis. In view of the main problems existing in the distribution network, such as too large power supply radius, too small line diameter, too many segments, redundancy of connection, etc., the transformation measures of the specific problems of taking line as unit and transforming distribution into node are generated. The validity and feasibility of the proposed model and method are verified by the calculation and analysis of a city"s power grid.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司