• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
拜润卿,常平,刘文飞,汤奕.光热电站促进风电消纳的电力系统优化调度*[J].电测与仪表,2020,57(22):1-6.
Bai Runqing,Chang Ping,Liu Wenfei,Tang Yi.Optimal Dispatching of Power System for Promoting Wind Power Accommodation by Introducing CSP Plant[J].Electrical Measurement & Instrumentation,2020,57(22):1-6.
光热电站促进风电消纳的电力系统优化调度*
Optimal Dispatching of Power System for Promoting Wind Power Accommodation by Introducing CSP Plant
DOI:DOI: 10.19753/j.issn1001-1390.2020.22.001
中文关键词:  光热电站  风电消纳  风电功率爬坡  光热-风电优化模型
英文关键词:concentrating  solar power  plant, wind  power accommodation, wind  power ramping  CSP-Wind  optimization model
基金项目:国家重点研发计划资助项目(2017YFB0903000);国家自然科学基金资助项目(51577030);国家电网公司科技项目资助(52272217001A).
           
作者中文名作者英文名单位
拜润卿Bai Runqing国网甘肃省电力公司电力科学研究院
常平Chang Ping东南大学 电气工程学院
刘文飞Liu Wenfei国网甘肃省电力公司电力科学研究院
汤奕Tang Yi东南大学 电气工程学院
摘要点击次数: 1300
中文摘要:
      针对风电并网消纳困难问题,文中利用光热电站中蓄热系统的可调度性和电加热装置自身的消纳能力,提出一种光热电站促进风电消纳的电力系统优化调度方法。该方法以一种光热-风电系统结构为基础,分析光热电站的内部简化模型和风电功率爬坡事件的短时间尺度辨识方法。然后以系统综合成本最低为目标,考虑各种机组的运行特性和约束条件,建立光热-风电优化模型,对系统进行优化调度。利用MATLAB优化工具箱在IEEE-RTS24节点系统上对该方法进行仿真验证。结果表明,高比例风电并网时,光热电站的参与可以缓解系统中火电机组快速出力调节的压力,在保证系统运行经济性的同时,促进风电并网消纳。
英文摘要:
      For the difficulty of wind power grid-connected, a power system optimization dispatching method using the concentrating solar power (CSP) plant to promote wind power accommodation is proposed, considering the dispatch-ability of the thermal storage system and the capacity of the electric heating device in the CSP plant. The method analyzes the internal simplified model of the CSP plant and the short time scale identification method of the wind power ramping event based on a kind of CSP-Wind system structure. Furthermore, the operating characteristics and constraints of various units are considered with the goal of the lowest system comprehensive cost, to establish a CSP-Wind optimization model for dispatching power system optimally. The method was simulated and verified on the IEEE-RTS24 node system by using MATLAB optimization toolbox. The results demonstrate that the participation of the CSP plant can alleviate the pressure of the fast output regulation of the thermal power unit in the power system, and reduce the curtailment of wind power and wind power ramping events while ensuring the economical operation of the power system when the high proportion of wind power is connected to the grid.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司