• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
李慧奇,郭鑫,刘勇,刘承志,李军,潘卓洪.交流特高压对平行架设线路挂接临时地线上的电磁感应分析[J].电测与仪表,2021,58(5):55-61.
LI Huiqi,GUO Xin,LIU Yong,LIU Chengzhi,LI Jun,PAN Zhuohong.Electromagnetic induction analysis of AC high voltage on parallel line erected temporary ground line[J].Electrical Measurement & Instrumentation,2021,58(5):55-61.
交流特高压对平行架设线路挂接临时地线上的电磁感应分析
Electromagnetic induction analysis of AC high voltage on parallel line erected temporary ground line
DOI:10.19753/j.issn1001-1390.2021.05.008
中文关键词:  架线施工  杆塔接地电阻  多处接地  感应电压  感应电流  临时接地线
英文关键词:Construction work  tower grounding resistance  multiple grounding  induced voltage  induced current  temporary grounding wire
基金项目:国家杰出青年科学基金
                 
作者中文名作者英文名单位
李慧奇LI Huiqi华北电力大学 河北省输变电设备安全防御重点实验室
郭鑫GUO Xin华北电力大学 河北省输变电设备安全防御重点实验室
刘勇LIU Yong国网安徽省电力有限公司
刘承志LIU Chengzhi国网安徽省电力有限公司
李军LI Jun保定吉达电力设计有限公司
潘卓洪PAN Zhuohong华北电力大学 河北省输变电设备安全防御重点实验室
摘要点击次数: 1858
中文摘要:
      平行交流特高压带电线路架线施工中,线路感应电情况十分复杂和严重,线路升空后主要经由杆塔临时接地线接地,施工中挂接地线过少会出现接地线熔断现象。本文基于电磁暂态分析软件建立了同塔双回交流带电线路以及平行架设的昌吉—古泉±1 100 kV直流施工线路的模型,计算了施工线路多处接地线上的感应电压和感应电流,总结了不同接地方案下感应电压和电流的分布特性,分析了影响感应电压和电流的因素。通过现场试验验证了施工线路多处挂接地线的有效性。研究结果为平行特高压交流输电线路架线安全和施工线路接地方案提供了理论基础。
英文摘要:
      In the construction of parallel AC UHV live lines, the line induction is very complicated and serious. After the line is lifted, it is mainly grounded through the temporary grounding wire of the tower. If the number of grounding wires is too small during construction, the grounding wire will be blown. Based on the electromagnetic transient analysis software, this paper establishes the model of the double-circuit AC live line on the same tower and the Changji-Guquan ±1 100 kV DC construction line set up in parallel, and calculates the induced voltage and induced current on multiple grounding lines of the construction line. The distribution characteristics of induced voltage and current under different grounding schemes are analyzed, and the factors affecting the induced voltage and current are analyzed. The effectiveness of multiple grounding lines on the construction line was verified by field tests. The research results provide a theoretical basis for parallel UHV AC transmission line safety and construction line grounding scheme.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司