• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
李莉,阳东升,余梦天,李卓,熊炜,黄友金.基于改进混合法的电网运行可靠性评估方法研究[J].电测与仪表,2021,58(10):74-79.
Li Li,Yang Dongsheng,Yu Mengtian,Li Zhuo,Xiong Wei,Huang Youjin.Research on Reliability Assessment Method of Power Grid Operation Based on Improved Hybrid Method[J].Electrical Measurement & Instrumentation,2021,58(10):74-79.
基于改进混合法的电网运行可靠性评估方法研究
Research on Reliability Assessment Method of Power Grid Operation Based on Improved Hybrid Method
DOI:10.19753/j.issn1001-1390.2021.10.011
中文关键词:  电力系统  运行可靠性评估  混合法  电网连锁故障  多属性决策
英文关键词:power  system, operation  reliability assessment, Hybrid  Method, grid  cascading failure, multi-attribute  decision
基金项目:贵州省科学技术基金(黔科合基础[2019]1058); 贵州省科学技术基金(黔科合基础[2019]1128)
                 
作者中文名作者英文名单位
李莉Li Li贵州电网有限责任公司电力科学研究院
阳东升Yang Dongsheng贵州电网有限责任公司电力科学研究院
余梦天Yu Mengtian贵州大学电气工程学院
李卓Li Zhuo贵州大学电气工程学院
熊炜Xiong Wei贵州大学电气工程学院
黄友金Huang Youjin贵州大学电气工程学院
摘要点击次数: 1367
中文摘要:
      针对电网运行可靠性评估中难以计及系统的高阶故障状态影响、使用传统可靠性评估方法已经不能满足运行可靠性指标的计算时间要求等问题,提出一种解析法与蒙特卡洛法相结合的改进混合法,其基本思想是:首先利用解析法处理系统的N-1阶故障,计算初始可靠性指标;然后对于系统的高阶故障以预想事故链替代,采用蒙特卡洛法抽样出连锁故障的初始环节,再进行中间环节的判断识别,并计算中间可靠性指标;最后累计计算系统的可靠性指标,实现系统的运行可靠性评估。通过对RTS-79算例和贵州某地区电网为例分析,并与传统的蒙特卡洛法对比系统是否考虑连锁故障的可靠性指标计算效果,验证了本文所提方法的正确性与有效性。
英文摘要:
      In view of the problem that the high-order fault state of the system is difficult to be considered in the reliability assessment of the grid operation, and the traditional reliability assessment method can not meet the calculation time requirements of the operational reliability index, an analytical method combined with the Monte Carlo method is proposed. The basic idea of the improved hybrid method is: firstly, the N-1 fault of the system is processed by the analytical method, and the initial reliability index is calculated; then, the high-order fault of the system is replaced by the expected accident chain, and the Monte Carlo method is used to sample the cascading fault. In the initial step, the intermediate link is judged and identified, and the intermediate reliability index is calculated. Finally, the reliability index of the system is calculated and the system operation reliability evaluation is realized. Through the analysis of RTS-79 system and a power grid in Guizhou Province, and comparing with the traditional Monte Carlo method, the correctness and validity of the proposed method are verified.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司