• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
范宏,陆骁霄.基于HSS算法的多区域虚拟电厂综合能源调度[J].电测与仪表,2021,58(1):124-130.
Fan hong,Lu Xiaoxiao.Integrated energy scheduling of multi-region virtual power plantsbased on HSS algorithm[J].Electrical Measurement & Instrumentation,2021,58(1):124-130.
基于HSS算法的多区域虚拟电厂综合能源调度
Integrated energy scheduling of multi-region virtual power plantsbased on HSS algorithm
DOI:10.19753/j.issn.1001-1390.2021.01.018
中文关键词:  综合能源系统  虚拟电厂  多区域  日前-日内调度  超球面搜索算法
英文关键词:Integrated energy system  virtual power plant  multi-region  day-ahead and day-inside scheduling  Hyper-Spherical Search algorithm
基金项目:国家重点研发计划项目
     
作者中文名作者英文名单位
范宏Fan hong上海电力大学 电气工程学院
陆骁霄Lu Xiaoxiao上海电力大学 电气工程学院
摘要点击次数: 1742
中文摘要:
      综合能源的提出实现了不同能源之间的相互耦合,实现了能源高效梯级利用,本文在此基础上建立了计及系统网损的多区域虚拟电厂综合能源日前-日内调度模型。首先,本文建立了采用日前-日内多时间尺度调度方法,在满足热电联产机组及储能出力约束前提下的以成本最小为目标的系统模型。然后,考虑模型为非线性优化问题,采用超球面搜索算法寻找系统最优解。最后,将某园区作为仿真对象,对比分析虚拟电厂间协同调度和单独运行两者不同情况下的出力及运行费用,研究电网及热网的重要节点或联络线端口的电压,并将超球面搜索算法同传统粒子群算法运行结果进行对比,最终验证本文所提模型及算法的可行性。
英文摘要:
      The proposed comprehensive energy realizes the mutual coupling between different energy sources, and realizes the high-efficiency cascade utilization of energy. Based on this, this paper establishes a day ahead day internal scheduling model of multi-regional virtual power plant comprehensive energy, which takes into account the system network loss. First of all, this paper establishes a system model with the minimum operating cost as the goal under the premise of satisfying the constraints of cogeneration unit and energy storage output by using the day ahead day multi time scale scheduling method. Then, considering that the model is a nonlinear optimization problem, the Hyper-Spherical Search algorithm is used to find the optimal solution of the system. Finally, a park is taken as a simulation object. Simultaneous interpreting and analyzing the output and operation cost under different conditions of the collaborative operation and the separate operation of the virtual power plant, the voltage of the important node or tie line port of the power grid and the heat network is studied. The Hyper-Spherical Search algorithm is compared with the operation results of the traditional particle swarm algorithm, and the feasibility of the proposed model and algorithm is finally verified.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司