• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 社长及主编
    • 期刊荣誉
  • 编委会
    • 主任委员
    • 编委名单
    • 青年编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
张朝辉,杨家豪,苏杰和.直流互联异步电网的HVDC与AGC协同功率分配[J].电测与仪表,2022,59(1):162-167.
Zhang Zhaohui,Yang Jiahao,Su Jiehe.Collaborative dispatch algorithmfor HVDC and AGC in DC interconnected asynchronous power grid[J].Electrical Measurement & Instrumentation,2022,59(1):162-167.
直流互联异步电网的HVDC与AGC协同功率分配
Collaborative dispatch algorithmfor HVDC and AGC in DC interconnected asynchronous power grid
DOI:10.19753/j.issn1001-1390.2022.01.022
中文关键词:  异步电网  高压直流输电  功率分配  一致性算法
英文关键词:asynchronous power grid, HVDC, power dispatch, consensus algorithm
基金项目:福建省中青年教师教育科研项目(JT180797);漳州市自然科学基金项目(ZZ2019J28)
        
作者中文名作者英文名单位
张朝辉Zhang Zhaohui中国南方电网有限责任公司超高压输电公司广州局,广州 510663
杨家豪Yang Jiahao厦门大学 嘉庚学院,福建 漳州 363105
苏杰和Su Jiehe中国南方电网有限责任公司超高压输电公司广州局,广州 510663
摘要点击次数: 2109
中文摘要:
      通过HVDC连接区域电网使得系统中出现直流互联异步电网,造成区域电网之间相互支援能力减弱,文中针对区域电网出现功率扰动后的频率调整问题,提出HVDC与AGC协同功率分配方法。介绍了电力系统频率调整模型以及HVDC参与一次调频的控制策略,基于一致性算法设计HVDC与AGC协同功率分配的方法,在二次调频阶段考虑各机组与HVDC的调节成本,以调节成本作为一致性状态变量设计功率分配算法,实现HVDC与AGC的协同控制,通过HVDC的功率调整使得互联异步电网也能够根据调节成本承担部分功率不平衡量,降低互联系统整体的调节成本。通过算例仿真验证了文中所提方法的有效性。
英文摘要:
      Connecting the regional power grid through HVDC makes the DC interconnected asynchronous power grid appear in the system, which weakens the mutual support ability between the regional power grids. Aiming at the frequency adjustment problem after the power disturbance occurs in the regional power grid, the cooperative power allocation method of HVDC and AGC is proposed in this paper. Firstly, the frequency adjustment model of power system and the control strategy of HVDC participating in primary frequency regulation are introduced. Secondly, the method of cooperative power allocation between HVDC and AGC is designed based on the consensus algorithm. In the secondary frequency regulation stage, the adjustment cost of each unit and HVDC is considered, and the power allocation algorithm is designed with the adjustment cost as the consistency state variable to realize the cooperative control of HVDC and AGC. The adjustment enables the connected asynchronous power grid to bear part of the power imbalance according to the adjustment cost and reduce the overall adjustment cost of the interconnected system. The effectiveness of the proposed method is verified by an example.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 社长及主编
    • 期刊荣誉
  • 编委会
    • 主任委员
    • 编委名单
    • 青年编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司