• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
宋忧乐,聂鼎,王科,金烨璇,刘涌.配电网规划中基于供给侧可靠性指标及其时空分解的精准投资问题研究[J].电测与仪表,2023,60(5):126-131.
Song Youle,Nie Ding,Wang Ke,Jin Yexuan,Liu Yong.Research on precision investment problems based on supply-side reliability index and its spatio-temporal decomposition in distribution network planning[J].Electrical Measurement & Instrumentation,2023,60(5):126-131.
配电网规划中基于供给侧可靠性指标及其时空分解的精准投资问题研究
Research on precision investment problems based on supply-side reliability index and its spatio-temporal decomposition in distribution network planning
DOI:10.19753/j.issn1001-1390.2023.05.018
中文关键词:  规划可靠性指标体系  指标时空分解  可靠性规划  精准投资
英文关键词:planning reliability index system, index spatiotemporal decomposition, reliability planning, precision investment
基金项目:
              
作者中文名作者英文名单位
宋忧乐Song Youle云南电网有限责任公司电力科学研究院, 昆明 650217
聂鼎Nie Ding云南电网有限责任公司电力科学研究院, 昆明 650217
王科Wang Ke云南电网有限责任公司电力科学研究院, 昆明 650217
金烨璇Jin Yexuan上海交通大学 电子信息与电气工程学院, 上海 200240
刘涌Liu Yong上海博英信息科技有限公司, 上海 200240
摘要点击次数: 1230
中文摘要:
      针对目前规划可靠性研究较少、缺乏规划可靠性指标、投资受到资金限制等问题,文章着眼于研究配电网规划中基于规划可靠性指标的精准投资方法。定义了规划可靠性指标体系,将该体系中的子指标进行时空分解以精细化可靠性投资提升;基于时空分解的可靠性指标建立精准投资决策模型,并在满足电力电量平衡的基础上,根据单位投资成本的可靠性提升程度确定待扩建项目的先后顺序。以南方某地区现状电网为例,证明了提出的时空分解和可靠性规划决策方法的正确性和可行性。
英文摘要:
      Aiming at the problems that the current planning reliability research of distribution network is lack of planning reliability indicators, and investment restrictions, this paper studies the precise investment method based on planning reliability indicators in distribution network planning. This paper defines the planning reliability index system, the sub-indicators in the index system are spatiotemporally decomposed in order to refine the reliability investment promotion. A precise investment decision model is established based on the decomposed reliability indicators, and on the basis of meeting the power balance, the order of the projects to be expanded is determined according to the degree of reliability improvement of unit investment costs. The current power grid of a region in the south China is taken in as an example to prove the correctness and effectiveness of the reliability planning decision method proposed in this paper.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司