• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
邵晨,陈丽,张敬平.计及煤改电的华北农村地区配电网改扩建规划研究[J].电测与仪表,2023,60(9):125-131.
Shao Chen,Chen Li,Zhang Jingping.Study on distribution network expansion planning in rural area of north China considering coal-to-electricity conversion[J].Electrical Measurement & Instrumentation,2023,60(9):125-131.
计及煤改电的华北农村地区配电网改扩建规划研究
Study on distribution network expansion planning in rural area of north China considering coal-to-electricity conversion
DOI:10.19753/j.issn1001-1390.2023.09.018
中文关键词:  煤改电  配电网改扩建规划  遗传算法  全寿命周期成本
英文关键词:coal-to-electricity, distribution network expansion planning, genetic algorithm, life cycle cost
基金项目:
        
作者中文名作者英文名单位
邵晨Shao Chen河北农业大学 机电工程学院, 河北 保定 071000
陈丽Chen Li河北农业大学 机电工程学院, 河北 保定 071000
张敬平Zhang Jingping国网沧州供电公司,河北 沧州 061000
摘要点击次数: 903
中文摘要:
      “十三五”以来,京津冀地区大力推进“煤改电”,稳步推进电能替代进程。随着用电负荷的增加,农村低压配电网如何进行改扩建规划成为一个问题。文中考虑配电变压器成本、配电线路成本、系统线损成本,建立了基于全寿命周期成本的配电网改扩建规划模型,采用遗传算法进行了模型求解。结合配电网规划模型求解特点,设计了基于实数编码的策略,显著提高了平行解生成效率,某农村实际配电网规划为算例进行了验证。结果表明,所提方法在满足煤改电负荷需求的前提下,实现了规划方案全寿命周期经济性最优。
英文摘要:
      Since the 13th five-year plan, the Beijing-Tianjin-Hebei region has vigorously promoted the policy of "coal-to-electricity" and steadily promoted the process of electric energy substitution. With the increase of electricity load, how to carry out reconstruction and expansion planning of rural low-voltage distribution network becomes a problem. Considering distribution transformer cost, distribution line cost and system line loss cost, a distribution network expansion planning model based on life cycle cost is established and solved by genetic algorithm. According to the characteristics of distribution network planning model, a strategy based 〖JP4〗on real number coding is designed to improve the efficiency of parallel solution generation. Finally, an actual rural distribution network planning is taken as an example to verify the results. The results show that the proposed method achieves the life cycle economic optimization of the planning scheme on the premise of meeting the demand of coal-to-electricity load.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司