• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
彭艳,郭于明,韩淑媛,龚祝平.考虑P2G及多能融通的分布式能源网络优化调度[J].电测与仪表,2023,60(3):122-129.
Peng Yan,Guo Yuming,Han Shuyuan,Gong Zhuping.Optimal scheduling of distributed energy network considering P2G and multi-energy interchanges[J].Electrical Measurement & Instrumentation,2023,60(3):122-129.
考虑P2G及多能融通的分布式能源网络优化调度
Optimal scheduling of distributed energy network considering P2G and multi-energy interchanges
DOI:10.19753/j.isssn1001-1390.2023.03.018
中文关键词:  分布式能源网络  多能融通  P2G  优化调度  改进粒子群算法
英文关键词:distributed energy network(DEN)  multi-energy interchanges  power-to-gas  optimal scheduling  improved particle swarm optimization algorithm
基金项目:可再生能源与天然气融合的分布式能源的网络系统基础研究;基于耦合演化的变型设计节点配置问题研究
           
作者中文名作者英文名单位
彭艳Peng Yan华南理工大学工商管理学院
郭于明Guo Yuming井冈山大学机电工程学院
韩淑媛Han Shuyuan华南理工大学工商管理学院
龚祝平Gong Zhuping华南理工大学工商管理学院
摘要点击次数: 1685
中文摘要:
      研究分布式能源网络(distributed energy network,DEN)是解决传统分布式能源系统(distributed energy system,DES)动态供应错位问题的迫切需求。电转气(power-to-gas , P2G)技术及多能源融通在促进DEN发挥最大价值的同时,使其协调控制变得更加复杂。基于此,文章研究考虑P2G及电热气融通的DEN调度问题。首先以DEN运行成本最小建立数学模型,并在目标函数中考虑弃风、弃光成本,其次采用一种改进粒子群算法进行求解。结果分析表明,模型可通过优化能源供给方式,以最小运行成本满足不同用户的动态能源诉求;引入P2G实现富余电能的大范围时空平移,带来一定环保效益;构建多能融通网络,能够协调不同用户供需之间的差异性;考虑P2G及多能融通的DEN调度更为灵活、精准,综合性能优异。文章研究为未来DEN建设提供一定参考。
英文摘要:
      It is urgent to research distributed energy network (DEN) to solve the problem of dynamic supply misplacement based distributed energy system (DES).While power-to-gas (P2G) technology and multi-energy interchanges maximizing the benefits of DEN, the coordinated control of it becomes more complex. Based on this, this paper studied DEN optimal scheduling problem considering P2G and power, heat and gas interchanges. Firstly, the mathematical model was established, and the minimum cost of DEN operation was taken as the objective function which included the cost of abandoning wind and sun. Secondly, an improved particle swarm optimization algorithm was used to solve it. The results suggest that, the model can satisfy the dynamic energy demand of different users with minimum operating cost by optimizing the energy supply mode; the introduction of P2G can realize a wide range of spatiotemporal translation of surplus electric energy and bring certain environmental benefits; besides the interchanges may balance the difference in energy demand and supply between different users; DEN scheduling considering P2G and multi-energy integration is more flexible and accurate, with excellent comprehensive performance. This work provides some references for the future construction of DEN.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司