• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
张洋瑞,赵俊鹏,史轮,张冰玉.考虑边缘电源接入的煤改电台区供电可靠性分析方法[J].电测与仪表,2023,60(7):58-62,200.
Zhang Yangrui,Zhao Junpeng,Shi Lun,Zhang Bingyu.Reliability analysis method of power supply in the area of coal to radio station considering the access of edge power supply[J].Electrical Measurement & Instrumentation,2023,60(7):58-62,200.
考虑边缘电源接入的煤改电台区供电可靠性分析方法
Reliability analysis method of power supply in the area of coal to radio station considering the access of edge power supply
DOI:10.19753/j.issn1001-1390.2023.07.009
中文关键词:  煤改电  配电台区  供电可靠性  平均供电可用率  蒙特卡洛模拟
英文关键词:Coal to electricity  distribution area  power supply reliability  average power supply availability  Monte Carlo simulation
基金项目:
           
作者中文名作者英文名单位
张洋瑞Zhang Yangrui国网河北省电力有限公司电力科学研究院
赵俊鹏Zhao Junpeng国网河北省电力有限公司电力科学研究院
史轮Shi Lun国网河北省电力有限公司电力科学研究院
张冰玉Zhang Bingyu国网河北省电力有限公司电力科学研究院
摘要点击次数: 1067
中文摘要:
      随着煤改电进程的进行,煤改电台区的供电可靠性评估已成为一门重要课题。考虑煤改电台区在功率紧张时期接入边缘电源建立其供电可靠性评估模型。首先采用采用平均供电可用率指标建立煤改电台区计及边缘电源的供电可靠性评估指标模型,其次构建煤改电台区供电可靠性评估流程,建立边缘电源并网时间概率分布模型,在建立基于蒙特卡洛模拟法的煤改电台区运行状态概率评估方法的基础上给出供电可靠性评估步骤。最后针对一个含边缘电源接入的煤改电配电台区进行供电可靠性评估,通过两种评估场景进行供电可靠性指标评估和对比,验证了本文方法的有效性和合理性。
英文摘要:
      With the progress of coal to electricity transformation, power supply reliability evaluation of coal to radio area has become an important topic. The power supply reliability evaluation model is established considering that the coal to radio area is connected to the edge power supply during the power shortage period. First of all, the evaluation index model of power supply reliability considering the marginal power supply is established by using the average power supply availability index. Secondly, the evaluation process of power supply reliability in the coal to radio area is constructed, and the probability distribution model of the grid connection time of the marginal power supply is established. Based on the probability evaluation method of the operation state of the coal to radio area based on the Monte Carlo simulation method, the power supply reliability is given Assessment steps. Finally, power supply reliability evaluation is carried out for a coal to electricity distribution station area with edge power supply access. The effectiveness and rationality of this method are verified by two evaluation scenarios for power supply reliability index evaluation and comparison.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司