• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 社长及主编
    • 期刊荣誉
  • 编委会
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
张红斌,冯明灿,孙钦斐,井天军,梁安琪.基于主成分分析法的煤改电综合效益评估模型研究[J].电测与仪表,2023,60(11):99-104.
ZHANG Hongbin,FENG Mingcan,SUN Qinfei,JING Tianjun,LIANG Anqi.Research on comprehensive benefit evaluation model of coal-to-electricity based on principal component analysis[J].Electrical Measurement & Instrumentation,2023,60(11):99-104.
基于主成分分析法的煤改电综合效益评估模型研究
Research on comprehensive benefit evaluation model of coal-to-electricity based on principal component analysis
DOI:10.19753/j.issn1001-1390.2023.11.014
中文关键词:  “煤改电”项目  综合效益评估  主成分分析法  评价指标
英文关键词:“coal-to-electricity” project, comprehensive benefit evaluation, principal component analysis method, evaluation index
基金项目:
              
作者中文名作者英文名单位
张红斌ZHANG Hongbin国网经济技术研究院有限公司
冯明灿FENG Mingcan国网经济技术研究院有限公司
孙钦斐SUN Qinfei国网北京市电力公司电力科学研究院
井天军JING Tianjun中国农业大学 信息与电气工程学院
梁安琪LIANG Anqi国网北京市电力公司电力科学研究院
摘要点击次数: 756
中文摘要:
      随着我国北方地区雾霾问题日益突出,“煤改电”得到广泛关注,如何对其综合效益进行科学评价值得深入研究。为此,基于主成分分析方法提出了一种评价“煤改电”项目综合效益的模型。基于对环保效益、社会效益、经济效益的全面考虑,建立了综合效益评价指标体系。在此基础上,基于所有的评价指标,剥离出主成分因素,实现了不同“煤改电”方案的综合效益评价。以5个区域实施的“煤改电”项目为例进行分析,结果表明,所提模型能够在最大降低总体计算工作量的前提下实现对“煤改电”项目综合效益的高效客观评价,为“煤改电”项目的实施提供指导与参考作用。
英文摘要:
      As the problem of smog becomes more and more prominent in the northern part of China, "coal-to-electricity" has received extensive attention. How to scientifically evaluate its comprehensive benefits is worthy of further study. Therefore, based on the principal component analysis method, a model for evaluating the comprehensive benefits of the “coal-to-electricity” project is proposed in this paper. A comprehensive benefit evaluation index system is constructed by comprehensively considering environmental protection benefits, social benefits, and economic benefits. On this basis, based on all the evaluation indicators, the main component factors are stripped out, and the comprehensive benefit evaluation of different “coal to electricity” schemes is realized. Five "coal-to-electricity" projects implemented in different regions are taken as examples for analysis. The results show that the proposed model can effectively and objectively evaluate the comprehensive benefits of "coal to electricity" project on the premise of minimizing the overall calculation workload, which provides guidance and reference for the implementation of "coal to electricity" project.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 社长及主编
    • 期刊荣誉
  • 编委会
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司