• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
刘慧文,邢宏伟,房鑫炎,李亦凡,金力.基于功率逐级切换控制的内河船舶负荷转供策略[J].电测与仪表,2023,60(8):44-50.
liluhuiwen,xinghongwei,fangxinyan,liyifan,jinli.Inland river ship-load transfer strategy based on step-by-step power control[J].Electrical Measurement & Instrumentation,2023,60(8):44-50.
基于功率逐级切换控制的内河船舶负荷转供策略
Inland river ship-load transfer strategy based on step-by-step power control
DOI:10.19753/j.issn1001-1390.2023.08.008
中文关键词:  岸电  内河流域  负荷转供  逐级切换控制
英文关键词:shore power, inland river, load transfer, step-by-step power control
基金项目:国家电网公司总部科技项目: 跨省内河流域港口岸电智能化平台接入运营关键技术研究及示范应用(5418-201971157A-0-0-00)
              
作者中文名作者英文名单位
刘慧文liluhuiwen国网电动汽车服务有限公司
邢宏伟xinghongwei国网电动汽车服务有限公司
房鑫炎fangxinyan上海交通大学
李亦凡liyifan上海交通大学
金力jinli上海交通大学
摘要点击次数: 768
中文摘要:
      针对我国内河流域港口岸电的船舶负荷转供过程的研究,为抑制并网后直接切断船侧柴电系统引起的逆功率与负荷波动问题,提出一种基于船侧负荷由船电转供至岸电的功率逐级切换控制方法。通过分析岸电对船侧负荷转供过程中的功率波动现象,给出基于功率超调和动态响应时间为指标的逐级切换的条件,以船侧负荷的电能质量指标为标准,通过对船侧同步电机的输出功率进行逐级调速控制,以降低功率波动以及频率偏移对负荷的负面影响,提高供电质量。通过SIMULINK平台搭建岸电系统模型进行仿真,对这一方法的仿真结果表明了所提出的策略的正确性和有效性,能够实现岸船两侧电力系统的并网后负荷的平稳过渡。
英文摘要:
      In view of the research on the process of ship load transfer in the shore power of the inland river basins, in order to suppress the reverse power and load fluctuations caused by directly cutting off the ship''s diesel power system after grid connection, a step-by-step power switching control solution based on load transfer from ship power to shore power is proposed. By analyzing the power fluctuation phenomenon in the process of shore power load transfer, the conditions of step-by-step switching based on power overshoot and dynamic response time are given. Based on the power quality index of the ship''s side load, the output power of the ship''s synchronous motor is under step-by-step control to reduce the negative impact of power fluctuation and load frequency offset, also improve the quality of power supply. Build a shore power simulation platform by Simulink to study the advantages and disadvantages of power step-by-step switching control and existing strategies. The simulation results show that the proposed strategy is correct and effective. It can achieve the smooth transition of load after grid connection.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司