• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
马骏毅,李桐歌,周杨,黄永红,岳帅,孙海翔.基于改进模拟退火算法的黑启动网架重构策略研究[J].电测与仪表,2021,58(10):36-42.
Ma Junyi,Li Tongge,Zhou Yang,Huang Yonghong,Yue Shuai,Sun Haixiang.Research on reconfiguration strategy of black start grid based on improved simulated annealing algorithm[J].Electrical Measurement & Instrumentation,2021,58(10):36-42.
基于改进模拟退火算法的黑启动网架重构策略研究
Research on reconfiguration strategy of black start grid based on improved simulated annealing algorithm
DOI:10.19753/j.issn1001-1390.2021.10.006
中文关键词:  子区域划分  Dijkstra算法  模拟退火算法  区域负荷启动系数  协同度优化
英文关键词:subregion division, Dijkstra algorithm, simulated annealing algorithm, area load start factor, synergetic optimization
基金项目:国网江苏省电力有限公司科技项目(J2020014)
                 
作者中文名作者英文名单位
马骏毅Ma Junyi国网镇江供电公司
李桐歌Li Tongge江苏大学电气信息工程学院
周杨Zhou Yang国网镇江供电公司
黄永红Huang Yonghong江苏大学电气信息工程学院
岳帅Yue Shuai国网镇江供电公司
孙海翔Sun Haixiang国网镇江供电公司
摘要点击次数: 1405
中文摘要:
      为合理规划大停电后待恢复机组和负荷所在子区域,尽力减少停电对重要负荷造成的损失,本文提出了基于改进模拟退火算法的黑启动网架重构策略。首先对待恢复网架进行图抽象,建立含分布式电源的网架重构模型。然后应用Dijkstra算法对待启动机组和负荷进行初步划分。最后结合加权模拟退火算法,引入区域负荷启动系数对各区域间协同度进行优化。该方法一方面使待恢复节点与启动电源之间电气距离最短,使黑启动网络吞吐量最大化;另一方面优先保障重要负荷顺利启动,同时缩小各子区域平均等待时长,提高黑启动效率。以IEEE39标准节点系统为算例,验证分析了该文方法的合理性和可行性。
英文摘要:
      In order to reasonably plan the sub-region of units and loads to be restored after a blackout, and to reduce the blackout loss of important loads, this paper proposes a reconstruction strategy of black start network frame based on improved simulated annealing algorithm. Firstly, the restoration grid is abstracted and a reconstruction model with distributed power supply is established. Then Dijkstra algorithm is applied to preliminarily divide units and loads to be started. Finally combined with the weighted simulated annealing algorithm, area load start factor is introduced to optimize the synergetic degree between regions. On one hand, this method minimizes the electrical distance between the node to be recovered and the starting power supply, and maximizes the black start network throughput. On the other hand, priority should be given to ensuring the smooth start of important loads, while the average waiting time of each sub-region should be reduced to improve the black start efficiency. The rationality of the method is verified by an example of IEEE39 standard node system.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司