• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
朱良管,曾平良,刘恺诚,丰俊杰.一种考虑孤岛运行和可再生能源出力不确定性的有源配电网供电可靠性分析方法[J].电测与仪表,2023,60(12):117-125.
朱良管,曾平良,刘恺诚,丰俊杰.An active distribution network reliability analysis method considering renewable generation uncertainties and islanding operations[J].Electrical Measurement & Instrumentation,2023,60(12):117-125.
一种考虑孤岛运行和可再生能源出力不确定性的有源配电网供电可靠性分析方法
An active distribution network reliability analysis method considering renewable generation uncertainties and islanding operations
DOI:10.19753/j.issn1001-1390.2023.12.017
中文关键词:  关键字:分布式可再生能源  孤岛运行  可靠性  蒙特卡洛
英文关键词:Keywords: Distributed renewable energy, Island operations , Reliability, Monte Carlo simulation method
基金项目:国家重点研发计划(2018YFE0208400),国家电网有限公司总部科技项目《面向跨境互联的多能互补新型能源系统关键技术研究》资助
           
作者中文名作者英文名单位
朱良管朱良管杭州电子科技大学
曾平良曾平良杭州电子科技大学
刘恺诚刘恺诚中国电力科学研究院
丰俊杰丰俊杰杭州电子科技大学
摘要点击次数: 647
中文摘要:
      摘要:随着分布式可再生能源并网比例的不断提高,配电网安全运行控制变得更加复杂,给供电可靠性分析带来新的挑战。本文提出一种考虑孤岛运行和可再生能源出力不确定性的有源配电网供电可靠性分析方法。首先,建立配电网关键元件及可再生能源场站设备可靠性模型,在此基础上,分析可再生能源资源概率分布,提出可再生能源潜在出力(REPO)多状态模型,进而建立考虑场站设备可靠性的可再生能源发电多状态模型,其次,利用馈线分区的概念划分孤岛运行范围,分析孤岛运行对供电可靠的影响,最后,基于序贯蒙特卡洛模拟法建立了有源配电网供电可靠性分析方法。并利用IEEE RBTS测试系统进行仿真,验证了所提方法的有效性。
英文摘要:
      With the increasing penetration of distributed renewable energy connected to the distribution network, the safe operation and control of the distribution network becomes more complex, which brings new challenges to the reliability analysis of power supply. This paper presents a new power supply reliability analysis method for active distribution networks considering the renewable generation output uncertainties and islanding operation. Firstly, a two state reliability model are established key components of distribution networks and renewable generation equipment, and based on the probability distribution analysis of renewable energy resources, such as wind and solar, a multi-state reliability model for potential renewable power output (REPO) has been developed, which leads to the proposal of a multi-state reliability model for renewable power stations considering equipment conditions. Secondly, the concept and benefit of islanding operation by the feeder partition with embedded distributed generation were analyzed, its impact on power supply and reliability analysis were modelled. Finally, an active distribution reliability analysis method based using sequential Monte Carlo simulation technique is used to assess the active power distribution network power supply reliability. The effectiveness of the proposed method is verified and applied using an IEEE RBTS test system.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司