• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
杨帆,张旭,乐健.500 kV限流器接入对南网系统过电压的影响分析[J].电测与仪表,2024,61(2):191-196.
YANG Fan,ZHANG Xu,LE Jian.Analysis of the influence of a 500 kV current limiter on overvoltage characteristics of china southern power grid[J].Electrical Measurement & Instrumentation,2024,61(2):191-196.
500 kV限流器接入对南网系统过电压的影响分析
Analysis of the influence of a 500 kV current limiter on overvoltage characteristics of china southern power grid
DOI:10.19753/j.issn1001-1390.2024.02.028
中文关键词:  限流电抗器  短路故障  过电压  电磁暂态仿真
英文关键词:current limiting reactor, short-circuit fault, overvoltage, electromagnetic transient simulation
基金项目:国家重点研发计划(2018YFB0904300)
        
作者中文名作者英文名单位
杨帆YANG Fan广州电力设计院有限公司
张旭ZHANG Xu广州电力设计院有限公司
乐健LE Jian武汉大学电气与自动化学院 湖北 武汉
摘要点击次数: 991
中文摘要:
      串联限流电抗器能有效限制500 kV电压等级的短路电流,但其接入系统后会影响系统的过电压水平,需要进一步进行安全校验。以广南站500 kV/90 kA 限流器示范工程为背景,利用电磁暂态仿真软件EMTP 研究500 kV限流电抗器自身的过电压以及限流电抗器接入后对系统的工频过电压、操作过电压、线路断路器的暂态恢复电压,以保证系统与设备的安全运行。结果表明,无论是否采用限流电抗器,顺德-广南500 kV线路无故障甩负荷和单相故障切负荷时的工频过电压均在允许的范围内;500 kV限流电抗器接入后的顺德-广南500 kV线路合闸操作过电压未超过标准允许范围,变电站及限抗站金属氧化物避雷器MOA能耗及电流与其设计参数相比有很大的裕度。
英文摘要:
      The series current limiting reactor can effectively limit the short-circuit current of 500 kV voltage level, but it will affect the overvoltage level of the system after it is connected to the system, and further safety verification is required. Taking the 500 kV/90 kA current limiter demonstration project of Guangnan station as the background, the electromagnetic transient simulation software of EMTP is used to study the overvoltage of the 500 kV current limiting reactor itself and the power frequency overvoltage and operating overvoltage of the current limiting reactor to the system, the transient recovery voltage of the circuit breaker, etc., so as to ensure the safe operation of the system and equipment. The results show that the power frequency overvoltage of Shunde-Guangnan 500 kV transmission line in the case of load rejection without fault and load switching with single phase fault is within the allowable range, no matter whether the current limiting reactor is used or not. The switching overvoltage of the 500 kV Shunde-Guangnan line after the connection of the current limiting reactor does not exceed the allowable range of the standard, and the MOA energy consumption and current of the MOA in the substation and the limiting reactance station have a large margin compared with the design parameters.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司