• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
易辰颖,胡志坚,林伟伟.基于主从博弈的主动配电网分布式电源与独立储能协同规划方法[J].电测与仪表,2024,61(5):83-90.
Yi Chenying,Hu Zhijian,Lin Weiwei.Cooperative planning method of distributed generation and independent energy storage in active distribution network based on Stackelberg game[J].Electrical Measurement & Instrumentation,2024,61(5):83-90.
基于主从博弈的主动配电网分布式电源与独立储能协同规划方法
Cooperative planning method of distributed generation and independent energy storage in active distribution network based on Stackelberg game
DOI:10.19753/j.issn1001-1390.2024.05.013
中文关键词:  独立储能  主从博弈  分布式电源  源-储协同规划
英文关键词:independent energy storage, Stackelberg game, distributed generation, source-storage cooperative planning
基金项目:国家自然科学基金资助项目(51977156)
        
作者中文名作者英文名单位
易辰颖Yi Chenying武汉大学 电气与自动化学院
胡志坚Hu Zhijian武汉大学 电气与自动化学院
林伟伟Lin Weiwei国网福建省电力有限公司经济技术研究院
摘要点击次数: 640
中文摘要:
      为进行电力市场改革背景下的分布式电源(DG)与独立储能的合理规划,文中以分布式电源运营商(DGO)和独立储能运营商(IESO)为投资主体,分别对配电网中DG和独立储能的安装容量进行决策。以DGO为主导者、IESO为跟从者构建主从博弈双层规划模型。针对独立储能制定了消纳新能源出力与电池余量套利相结合的运行策略,并引入交易电价,使DGO利用弃风弃光部分与IESO开展交易。采用标准粒子群算法与数学优化方法相结合的方式求解模型,通过IEEE 33节点配电系统仿真分析表明,所提出的规划方法可有效提高规划的经济性,有利于储能的市场化发展,同时可提高DG渗透率,减小弃风弃光率。
英文摘要:
      In order to carry out the reasonable planning of distributed generation (DG) and independent energy storage under the background of electric power market reform, the distributed generation operator (DGO) and independent energy storage operator (IESO) are the main investor to make decisions on the installation capacity of DG and independent energy storage respectively in distribution network, and the bi-level planning model of Stackelberg game is constructed with DGO as the guider and IESO as the follower. For independent energy storage, an operation strategy combining renewable energy consumption with interest arbitrage is formulated, and the transaction tariff is introduced to enable DGO to trade with IESO by using the abandoned power of DG. The model is solved by the method which combines the standard particle swarm optimization with mathematical optimization method. The simulation analysis of IEEE 33-bus distribution system shows that the proposed planning method can effectively improve the economy of planning, facilitate the market development of energy storage, improve the penetration rate of DG and reduce the abandonment rate of DG.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司