• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
李胜文,张世锋,张敏,蒋海玮,徐少博.电压暂降与谐波谐振监测点统一优化配置方法[J].电测与仪表,2023,60(5):145-153.
Li Shengwen,Zhang Shifeng,Zhang Min,Jiang Haiwei,Xu Shaobo.Unified optimal configuration method of voltage sag and harmonic resonance monitoring points[J].Electrical Measurement & Instrumentation,2023,60(5):145-153.
电压暂降与谐波谐振监测点统一优化配置方法
Unified optimal configuration method of voltage sag and harmonic resonance monitoring points
DOI:10.19753/j.issn1001-1390.2023.05.021
中文关键词:  电压暂降  谐波谐振  可观性指标  监测点优化配置  层次分析法  模糊综合评价
英文关键词:voltage sag, harmonic resonance, observability index, optimal configuration of monitoring points, analytic hierarchy process method, fuzzy comprehensive evaluation
基金项目:国网山西省电力公司科技项目(52053018000z)
              
作者中文名作者英文名单位
李胜文Li Shengwen国网山西省电力公司电力科学研究院, 太原 030001
张世锋Zhang Shifeng国网山西省电力公司电力科学研究院, 太原 030001
张敏Zhang Min国网山西省电力公司电力科学研究院, 太原 030001
蒋海玮Jiang Haiwei新能源电力系统国家重点实验室(华北电力大学), 北京 102206
徐少博Xu Shaobo新能源电力系统国家重点实验室(华北电力大学), 北京 102206
摘要点击次数: 845
中文摘要:
      在考虑投资成本具有限定性的前提下,提出了一种电压暂降和谐波谐振监测点的统一优化配置方法。定义并量化了电压暂降可观性指标和谐波谐振可观性指标;综合考虑了电压暂降与谐波谐振可观性以及投资成本经济性,基于层次分析法和模糊综合评价法给出了监测点配置方案综合性能的量化分析方法;提出了以配置方案综合得分最高为目标,以监测装置数不超过限值为约束的监测点统一优化配置模型,并基于离散粒子群优化算法进行求解;基于IEEE-30节点测试系统进行了暂降与谐振监测点统一优化配置,仿真结果表明所提方法可在确保配置方案所需监测装置数满足投资成本限定的条件下,获得电压暂降可观性、谐波谐振可观性与监测装置数目经济性三者协调最优的监测点配置方案。
英文摘要:
      Considering the limitation of investment cost, a unified optimal configuration method of voltage sag and harmonic resonance monitoring points is proposed in this paper. The observability indices of voltage sag and harmonic resonance are defined and quantified; Considering the observability of voltage sag and harmonic resonance as well as the cost economy of investment, the quantitative analysis method of the comprehensive performance of monitoring point configuration scheme is given based on analytic hierarchy process (AHP) method and fuzzy comprehensive evaluation method; Then, a unified optimal configuration model of monitoring points is proposed, which takes the highest comprehensive score of the configuration scheme as the objective and the number of monitoring devices not exceeding the limit as the constraint, which is solved based on the discrete particle swarm optimization algorithm; Finally, the unified optimal configuration of sag and resonance monitoring points is carried out based on IEEE-30 bus test system. The simulation results show that the proposed method can obtain the optimal configuration scheme of monitoring points, whose voltage sag observability, harmonic resonance observability and economy of monitoring devices are coordinated optimal under the condition that the number of monitoring devices meets the investment cost limit.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司