• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
陈名铿,吴倩,张慧媛,许军.基于综合效益评估的远海风电柔直并网拓扑方案优选[J].电测与仪表,2024,61(7):65-73.
Chen Mingkeng,Wu Qian,Zhang Huiyuan,Xu Jun.Optimization of the topology scheme of far-offshore wind power grid-connected through VSC-HVDC based on comprehensive benefit evaluation[J].Electrical Measurement & Instrumentation,2024,61(7):65-73.
基于综合效益评估的远海风电柔直并网拓扑方案优选
Optimization of the topology scheme of far-offshore wind power grid-connected through VSC-HVDC based on comprehensive benefit evaluation
DOI:10.19753/j.issn1001-1390.2024.07.010
中文关键词:  远海风电  柔直并网  拓扑优选  综合效益评估
英文关键词:far-offshore wind power, grid-connected through vsc-hvdc, topology optimization, comprehensive benefit assessment
基金项目:国家电网公司总部科技项目(远海岸规模化海上风电高效送出关键技术研究,4000-202018044A-0-0-00)
           
作者中文名作者英文名单位
陈名铿Chen Mingkeng华北电力大学
吴倩Wu Qian国网江苏省电力有限公司经济技术研究院
张慧媛Zhang Huiyuan华北电力大学
许军Xu Jun华北电力大学
摘要点击次数: 310
中文摘要:
      为解决远海风电柔直并网拓扑优方案选时缺乏对多因素定量分析与重要性衡量的现状,基于综合效益评估的角度进行拓扑优选。具体的,构建涵盖经济性、利用率、可靠性3个因素的多指标评估体系并给出各指标的计算模型;提出改进层次分析法-熵权法确定多指标权重并利用TOPSIS法进行方案优劣排序;算例中对如东海上风电柔直工程的点对点、环形、星形拓扑方案进行综合效益评估与对比,并对可靠性权重与预防维护率进行灵敏度分析,验证所提模型的有效性。
英文摘要:
      In order to solve the problem of the lacking of multi-factor quantitative analysis and importance evaluation in the topology optimization of far-offshore wind power grid-connected through VSC-HVDC, the topology optimization is carried out based on the comprehensive benefit evaluation. Specifically, a multi-index evaluation system covering three factors of economy, utilization ratio and reliability is constructed and the calculation models of each index are given. An improved AHP-entropy weight method is proposed to determine multi-index weight and TOPSIS method is used to choose the best option. In the example, the comprehensive benefit of point-to-point, ring and star topology schemes of Rudong offshore wind power project is evaluated and compared, and the sensitivity analysis of reliability weight and preventive maintenance rate is carried out to verify the validity of the proposed model.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司