• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
林敏洪,丘冠新,李波,赵瑞锋,张勇,曹安瑛.两阶段鲁棒优化调度的光伏逆变器集中接入主动配电网研究[J].电测与仪表,2024,61(9):113-119.
LIN Minhong,QIU Guanxin,LI Bo,ZHAO Ruifeng,ZHANG Yong,CAO Anying.Research on centralized access of photovoltaic inverters to active distribution network based on two-stage robust optimal scheduling[J].Electrical Measurement & Instrumentation,2024,61(9):113-119.
两阶段鲁棒优化调度的光伏逆变器集中接入主动配电网研究
Research on centralized access of photovoltaic inverters to active distribution network based on two-stage robust optimal scheduling
DOI:10.19753/j.issn1001-1390.2024.09.015
中文关键词:  光伏逆变器  配电网  鲁棒性  光伏控制  优化调度  弃光费用
英文关键词:photovoltaic inverter  Distribution network  Robustness  Photovoltaic control  Optimize scheduling  The cost of discarding light
基金项目:南方电网公司科技项目(项目编号:GDKJXM20201748)
                 
作者中文名作者英文名单位
林敏洪LIN Minhong广东电网有限责任公司珠海供电局
丘冠新QIU Guanxin广东电网有限责任公司珠海供电局
李波LI Bo广东电网有限责任公司电力调度控制中心
赵瑞锋ZHAO Ruifeng广东电网有限责任公司电力调度控制中心
张勇ZHANG Yong广东电网有限责任公司珠海供电局
曹安瑛CAO Anying广东电网有限责任公司珠海供电局
摘要点击次数: 448
中文摘要:
      常规方法约束鲁棒优化目标函数时,忽略了光伏逆变器无功辅助约束条件,导致配电网优化后弃光费用和购电成本较高,为此提出了接入光伏逆变器的鲁棒优化调度方法。以最小化总预期成本为目标,计算两阶段鲁棒优化目标函数,第一阶段选取光伏能源、波动性负荷等调度成本,第二阶段选取弃光和失负荷的惩罚成本,通过支路潮流、配电网充放电功率限制,约束第一阶段目标函数,根据光伏逆变器无功辅助服务、逆变器接入节点电压等,约束第二阶段目标函数,构建鲁棒优化模型,搜索模型最优解,选取预期成本最小化的调度决策。选取电-热联供型配电网,接入6个光伏逆变器,设置对比实验结果表明,针对不同波动范围恶劣场景,设计方法相比常规方法,减少了弃光费用和购电成本,降低了弃光和失负荷量。
英文摘要:
      When constraining robust optimization objective function, conventional methods ignore the auxiliary constraint conditions of photovoltaic inverter reactive power, which leads to high cost of light abandonment and power purchase after optimization of distribution network. For this reason, a robust optimization scheduling method connected with photovoltaic inverters is proposed. To minimize the total expected cost, a two-stage robust optimization objective function was calculated. In the first stage, scheduling costs such as photovoltaic energy and fluctuating load were selected, and in the second stage, penalty costs of light abandoning and load loss were selected. The objective function in the first stage was constrained through the restrictions of branch flow and charging and discharging power of distribution network. According to the photovoltaic inverter reactive auxiliary service and inverter access node voltage, etc., the objective function of the second stage is constrained to build a robust optimization model, search the optimal solution of the model, and select the scheduling decision that minimizes the expected cost. The power-heat combined distribution network was selected, 6 photovoltaic inverters were connected, and the comparative experiment was set. The results showed that, for bad scenes with different fluctuation ranges, the design method reduced the cost of light abandonment and power purchase, as well as the amount of light abandonment and load loss compared with the conventional method.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司