• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
侯健敏,余威杰,徐志豪,丁苏云.考虑柔性电/热负荷的综合能源系统分布鲁棒优化调度[J].电测与仪表,2024,61(8):134-142.
HOU Jianmin,YU Weijie,XU Zhihao,DING Suyun.Distributionally robust optimal dispatching of integrated energy system with flexile electrical/thermal load[J].Electrical Measurement & Instrumentation,2024,61(8):134-142.
考虑柔性电/热负荷的综合能源系统分布鲁棒优化调度
Distributionally robust optimal dispatching of integrated energy system with flexile electrical/thermal load
DOI:10.19753/j.issn1001-1390.2024.08.018
中文关键词:  综合能源系统  柔性负荷  优化调度  分布鲁棒  不确定性
英文关键词:integrated energy system, flexible load, optimal dispatching, distributionally robust, uncertainty
基金项目:国家自然科学基金资助项目( 71503136)
           
作者中文名作者英文名单位
侯健敏HOU Jianmin1.南京信息工程大学 自动化学院, 南京 210044;2.南京信息工程大学 江苏省大气环境与装备技术协同创新中心,南京 210044
余威杰YU Weijie南京信息工程大学 自动化学院, 南京 210044
徐志豪XU Zhihao南京信息工程大学 自动化学院, 南京 210044
丁苏云DING Suyun南京信息工程大学 自动化学院, 南京 210044
摘要点击次数: 487
中文摘要:
      综合能源系统(integrated energy system, IES)的效益分析不仅取决于能源供给侧的调度方案,也受到需求侧用能方式的影响。基于此,在IES的需求侧引入柔性负荷响应,以平滑负荷曲线,进一步提升IES的风电消纳能力和经济效益;同时为尽量减小供能侧风电出力不确定性的影响、实现调度方案鲁棒性与经济性的均衡,构建了考虑柔性电负荷和柔性热负荷的IES两阶段分布鲁棒优化调度模型:预调度阶段以IES的日前综合调度成本最低为目标;再调度阶段以风电历史数据为基础,寻找最恶劣风电出力概率分布下的最优机组调节方案,并使用列约束生成算法进行求解。最后,采用算例验证了该模型的有效性。
英文摘要:
      The efficiency analysis of integrated energy system (IES) not only depends on the scheduling scheme of the supply side, but also is influenced by the energy consumption mode of the demand side. On this basis, the flexible load response is introduced on the demand side of IES to smooth the load curve and further improve the wind power consumption capacity and economic efficiency of IES. Meanwhile, in order to minimize the impact of wind power output uncertainty on the power supply side and achieve a balance between the robustness and economy of the scheduling scheme, a two-stage distributionally robust optimal dispatching model of IES with flexible electrical load and flexible thermal load is formulated, and the pre-dispatching stage aims at minimizing the day-ahead comprehensive dispatching cost of IES, while the re-dispatching stage finds the optimal unit regulation scheme under the worst probability distribution based on wind power output history data, and the column & constraint generation algorithm is used to solve the model. Finally, the effectiveness of the model is verified by example.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司