• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
侯磊,马涛,蔡毅,李娜,贾永会,金泰,潘崇超.孤岛型多能互补系统的规划与运行优化模型研究[J].电测与仪表,2022,59(3):108-116.
Hou lei,Ma tao,Cai yi,Li na,Jia yonghui,Jintai,Pan chongchao.Research on Optimization for planning and operation of Island Multi Energy Complementary System[J].Electrical Measurement & Instrumentation,2022,59(3):108-116.
孤岛型多能互补系统的规划与运行优化模型研究
Research on Optimization for planning and operation of Island Multi Energy Complementary System
DOI:10.19753/j.issn1001-1390.2022.03.014
中文关键词:  多能互补系统,孤岛模式,储能,容量配置,需求响应
英文关键词:integrated energy system, island model, energy storage, capacity allocation, demand response
基金项目:国家自然科学基金青年科学基金资助项目(52006114),国家电网公司科技资助项目(5400-202013124A-0-0-00)
                    
作者中文名作者英文名单位
侯磊Hou lei国网河北省电力有限公司雄安新区供电公司
马涛Ma tao国网河北省电力有限公司雄安新区供电公司
蔡毅Cai yi哈尔滨电工仪表研究所有限公司
李娜Li na国网综合能源服务集团有限公司
贾永会Jia yonghui国网河北省电力有限公司雄安新区供电公司
金泰Jintai北京科技大学智慧能源研究中心
潘崇超Pan chongchao北京科技大学智慧能源研究中心
摘要点击次数: 1933
中文摘要:
      在能源互联网高速发展的背景下,如何提高孤岛型多能互补系统(Integrated energy system,IES)的经济性与稳定性,已成为该领域的重点研究内容。本文构建了计及容量配置与运行调度的孤岛型IES两阶段优化模型。首先,在规划阶段,本文根据孤岛型IES的能源供应特性,负荷结构特性及设备运行特性,构建了孤岛模式下IES的精细化容量配置约束模型;然后,在运行阶段,基于规划阶段的配置优化结果,进一步引入激励型需求响应,以运行成本最小化为目标构建运行调度模型;最后,通过案例仿真来验证本文所提模型的有效性,仿真结果表明:P2G设备不适用于孤岛型IES,且储能设备的引入可以实现科学性容量配置,系统的年经济成本降低了19.7万元,在运行阶段引入需求响应后,进一步提高了IES的经济效益。
英文摘要:
      In the context of the rapid development of energy Internet, how to improve the economy and stability of islanded Integrated energy system (IES) is a research hotspot in this field. This paper constructed the islanded IES two-stage optimization model. First, in the planning stage, the refined capacity allocation constraint model of IES in island mode was constructed according to the energy supply characteristics, load structure characteristics and equipment operation characteristics of IES. Then, in the operation stage, based on the optimization results in the planning stage, the incentive-based demand response was further introduced, and the operation optimization model was constructed with the operation cost as the optimization objective. Finally, the effectiveness of the proposed model was verified by case simulation. The simulation results showed that. P2G equipment is not suitable for island-type IES, and the introduction of energy storage equipment can realize scientific capacity configuration, and the annual economic cost of the system is reduced by 197,000 yuan. After the introduction of demand response in the operation stage, the economic benefit of IES is further improved.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司