• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
罗远翔,范立东,王宇航,刘铖,矫英鹤,王云龙.风-光-火-抽蓄-蓄电池联合系统两阶段鲁棒规划[J].电测与仪表,2025,62(5):149-157.
Luo Yuanxiang,Fan Lidong,Wang Yuhang,Liu Cheng,Jiao Yinghe,Wang Yunlong.Two-stage robust planning for wind power-photovoltaic-thermal power-pumped storage-battery hybrid system[J].Electrical Measurement & Instrumentation,2025,62(5):149-157.
风-光-火-抽蓄-蓄电池联合系统两阶段鲁棒规划
Two-stage robust planning for wind power-photovoltaic-thermal power-pumped storage-battery hybrid system
DOI:10.19753/j.issn1001-1390.2025.05.018
中文关键词:  两阶段鲁棒优化  不确定性调节参数  风光消纳  环境成本  列和约束生成算法
英文关键词:two-stage robust optimization, uncertain adjustment parameters, wind and photovoltaic power consumption, environmental cost, column and constraint generation algorithm
基金项目:吉林省教育厅科学研究项目(JJKH20210092KJ);吉林市科技创新发展计划项目(20210103093)。
                 
作者中文名作者英文名单位
罗远翔Luo Yuanxiang东北电力大学电气工程学院
范立东Fan Lidong东北电力大学电气工程学院
王宇航Wang Yuhang东北电力大学电气工程学院
刘铖Liu Cheng东北电力大学电气工程学院
矫英鹤Jiao Yinghe东北电力大学电气工程学院
王云龙Wang Yunlong东北电力大学电气工程学院
摘要点击次数: 112
中文摘要:
      随着风光并网渗透率的快速增长,电力系统的不确定性急剧增加。针对大规模风光并网给电网规划带来的影响,文中构建了风-光-火-抽蓄-蓄电池联合系统的两阶段鲁棒规划模型,并引入不确定性调节参数降低模型的保守性。一阶段以投资成本和运维成本之和最小为目标确定联合系统的容量配置;二阶段在给定容量配置下,通过构建风光出力不确定集合,以环境成本、弃风弃光成本之和最小为目标,确定最优调度方案。针对鲁棒规划模型的特点,采用列和约束生成算法(column-and-constraint generation,C&CG)和强对偶理论,将原问题分解为具有混合整数线性特征的主问题和子问题进行求解,采用改进的IEEE30节点系统分析不同保守程度下规划方案的经济性,并验证所提模型的有效性。
英文摘要:
      With the rapid growth of wind power-photovoltaic grid-connected penetration, the uncertainty of the power system increases dramatically. Aiming at the impact of large-scale grid-connected wind power-photovoltaic on power grid planning, this paper constructs a two-stage robust planning model for the wind power-photovoltaic-thermal power-pumped storage-battery hybrid system, and introduces uncertain adjustment parameters to reduce the conservatism of the model. In the first stage, the capacity configuration of the hybrid system is aiming at minimizing the sum of investment cost and operation and maintenance cost. In the second stage, under a given capacity configuration, the optimal scheduling scheme is determined by constructing an uncertain set of wind power-photovoltaic output, aiming at minimizing the sum of environmental cost and cost of wind power-photovoltaic abandonment. According to the characteristics of the robust planning model, the column and constraint generation algorithm(C&CG) and strong pairwise theory are used to decompose the original problem into a major problem and sub-problem with mixed-integer linear characteristics to solve. The improved IEEE30-node system is followed to analyze the economics of the planning scheme under different conservative degrees, and the validity of the proposed model is verified.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司