• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 社长及主编
    • 期刊荣誉
  • 编委会
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
邱海枫,苏宁,田松林.基于改进BFGS算法的多DG电力系统故障重构研究[J].电测与仪表,2025,62(8):85-92.
QIU Haifeng,SU Ning,TIAN Songlin.Research on multi-DG power system fault reconstruction method based on improved BFGS algorithm[J].Electrical Measurement & Instrumentation,2025,62(8):85-92.
基于改进BFGS算法的多DG电力系统故障重构研究
Research on multi-DG power system fault reconstruction method based on improved BFGS algorithm
DOI:j.issn1001-1390.2025.08.010
中文关键词:  分布式电源  配电网  Kruskal 算法  BFGS算法  最小网损  最少开关动作
英文关键词:distributed generator, distribution network, Kruskal algorithm, BFGS algorithm, minimum network loss, minimum switch action
基金项目:中国南方南网有限责任公司科技项目(090000HA42190008)
        
作者中文名作者英文名单位
邱海枫QIU Haifeng深圳供电局有限公司
苏宁SU Ning深圳供电局有限公司
田松林TIAN Songlin南方电网深圳数字电网研究院有限公司
摘要点击次数: 75
中文摘要:
      分布式电源(distributed generator, DG)并网后,配电网的拓扑结构发生变化,文章将改进Kruskal算法和改进拟牛顿(Broyden-Fletcher-Goldfarb-Shanno, BFGS)算法相结合,以最小网损和最少开关动作次数为目标函数,用于含分布式电源的配电网故障重构。在配电系统发生故障时,使用改进的Kruskal算法对孤岛进行划分,将可以进行独立供电的分布式电源划分成孤岛,尽可能减少失电负荷量,岛外配电网采用使用改进的BFGS算法进行岛外重构。仿真结果表明,与重构前相比,所提方法可以有效降低有功损耗,单支路和多支路故障分别降低了97.268 3 kW、89.545 8 kW,系统节点的最小电压分别提高了0.039 0 p.u.、0.039 0 p.u.,开关动作次数分别为3次、4次。
英文摘要:
      For the grid connection of a large number of distributed generators, the topology of distribution network has changed, which has seriously affected the stability of power system. An improved Kruskal algorithm and improved Broyden-Fletcher-Goldfarb-Shanno (BFGS) algorithm are combined for distribution network fault reconfiguration with distributed generation, with the minimum network loss and minimum switching times as the objective function. When the distribution system fails, the improved Kruskal algorithm is used to divide the isolated islands, and the distributed generators that can supply power independently are divided into isolated islands to reduce the power loss load as much as possible, the off island distribution network adopts the improved BFGS algorithm for off island reconstruction. The simulation results show that compared with the previous reconstruction, this method can effectively reduce the active power loss, and the single-branch and multi-branch faults are reduced by 97.268 3 kW and 89.545 8 kW, the minimum voltage of the system node has been increased by 0.039 0 p.u. and 0.039 0 p.u., and the number of switching operations is 3 times and 4 times, respectively.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 社长及主编
    • 期刊荣誉
  • 编委会
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司