张明泽,栾文鹏,艾欣,刘博.基于边缘计算的台区短期负荷预测方法[J].电测与仪表,2024,61(4):93-99.
zhangmingze,Luan Wenpeng,Ai Xin,Liu Bo.Short-term substation load forecasting method based on edge computing[J].Electrical Measurement & Instrumentation,2024,61(4):93-99.
基于边缘计算的台区短期负荷预测方法
Short-term substation load forecasting method based on edge computing
DOI:10.19753/j.issn1001-1390.2024.04.014
中文关键词:  配电物联网  智能终端  短期负荷预测  仿射传播聚类  数据挖掘
英文关键词:distribution IoT, intelligent terminal, short-term load forecasting, affine propagation, data mining
基金项目:国家电网公司科技资助项目(520600230011)
           
作者中文名作者英文名单位
张明泽zhangmingze华北电力大学
栾文鹏Luan Wenpeng天津大学
艾欣Ai Xin华北电力大学
刘博Liu Bo天津大学
摘要点击次数: 1062
中文摘要:
      配变台区是配电物联网与用户交互的重要纽带,台区短期负荷预测对实现配电物联网的精益化管理具有重要意义。为缓解全部台区上传负荷数据所带来的通信压力,本文提出一种基于边缘计算的台区短期负荷预测方法,将台区智能配变终端存储30天的历史负荷数据作为样本数据,通过核平滑法对样本数据进行清洗,因样本数据较少考虑将样本归一化后,拆分为标幺曲线与基值分别计算提高预测结果精度。然后通过相关系数法构建历史负荷数据的相关系数矩阵,用相关系数矩阵替换仿射传播相似度矩阵后聚类求得相似日的标幺曲线,再通过加权求和求得待测日的标幺曲线。同时,按照相似日原理预测待测日基值,最终通过待测日标幺曲线和基值反归一化后得到待测日负荷曲线完成预测工作。通过山东某配变30天的历史负荷数据计算后表明,所提方法可以实现台区负荷量级小、样本少、波动大情形下的合理预测,占用主站计算资源较少,对配网精益化运维具有积极意义。
英文摘要:
      The LV substation short-term load forecasting is of great significance for achieving management of the distribution Internet of Things. In order to alleviate the communication pressure caused by uploading load data from all substations, this paper proposes a short-term substation load forecasting method based on edge computing. By using the 30-day historical load data stored by the intelligent distribution terminal as sample data, the sample data is cleaned using Nadaraya-Watson method. Due to the small amount of sample data, it is considered to normalize the sample and split it into standard unit curves and base value. Then, PCC matrix of historical load data is constructed, and the unit curve of similar days is obtained through AP clustering, and the unit curve of the test day is obtained through weighted summation. At the same time, forecast the base value of the test day and ultimately obtain the load curve of the test day. The result show that the proposed method can achieve reasonable prediction, and it occupies less computing resources in the main station. It has a positive significance for the operation and maintenance of the distribution network.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司