• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 社长及主编
    • 期刊荣誉
  • 编委会
    • 主任委员
    • 编委名单
    • 青年编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
王甫玉,王维庆,李笑竹,闫斯哲,王海云.考虑源荷双侧灵活碳减排的零碳园区两阶段鲁棒规划方法[J].电测与仪表,2026,63(7):124-136.
WANG Fuyu,WANG Weiqing,LI Xiaozhu,YAN Sizhe,WANG Haiyun.A two-stage robust planning method for zero carbon park considering flexible carbon reduction from both source and load sides[J].Electrical Measurement & Instrumentation,2026,63(7):124-136.
考虑源荷双侧灵活碳减排的零碳园区两阶段鲁棒规划方法
A two-stage robust planning method for zero carbon park considering flexible carbon reduction from both source and load sides
DOI:10.19753/ j.issn1001-1390.2026.07.012
中文关键词:  零碳园区  全生命周期评估  两阶段鲁棒规划  碳减排  能源转型
英文关键词:zero carbon park, life cycle assessment, two-stage robust planning, carbon reduction, energy transformation
基金项目:国家自然科学基金资助项目(52267005);国家自然科学基金资助项目(52307108)
              
作者中文名作者英文名单位
王甫玉WANG Fuyu可再生能源发电与并网技术教育部工程研究中心(新疆大学), 乌鲁木齐 830047
王维庆WANG Weiqing可再生能源发电与并网技术教育部工程研究中心(新疆大学), 乌鲁木齐 830047
李笑竹LI Xiaozhu可再生能源发电与并网技术教育部工程研究中心(新疆大学), 乌鲁木齐 830047
闫斯哲YAN Sizhe可再生能源发电与并网技术教育部工程研究中心(新疆大学), 乌鲁木齐 830047
王海云WANG Haiyun可再生能源发电与并网技术教育部工程研究中心(新疆大学), 乌鲁木齐 830047
摘要点击次数: 189
中文摘要:
      为了激活发电侧、用电侧各环节的灵活碳减排潜力,在保持传统园区原有规划的基础上,整合现有资源并进行规划改造。利用全生命周期评估(life cycle assessment, LCA)法计量园区碳排放与碳吸收过程,核算后提出碳中和规划指标。建立了考虑源荷不确定性、扩建设备约束以及碳灵活性等约束的园区灵活碳减排模型。最后,以园区规划成本最小为目标构建了两阶段鲁棒规划模型,采用列和约束生成算法得到规划问题最优解。算例表明, 所提模型能够优化园区能源结构,实现园区净零碳排放,并为传统园区转型升级提供科学支撑。
英文摘要:
      In order to activate the flexible carbon reduction potential of various links in the power generation and consumption sides, while maintaining the original planning of the traditional park, existing resources are integrated and planned for renovation. Firstly, the life cycle assessment (LCA) method is used to measure the carbon emissions and absorption processes of the park, and the carbon neutrality planning indicators are proposed after accounting. Then, a flexible carbon reduction model for the park is established, taking into account uncertainties in source and load, constraints on equipment expansion, and carbon flexibility. Finally, a two-stage robust planning model is constructed with the goal of minimizing the planning cost of the park, and the column and constraint generation algorithm is used to obtain the optimal solution to the planning problem. The calculation example shows that the proposed model can optimize the energy structure of the park, achieve net zero carbon emissions in the park, and provide scientific support for the transformation and upgrading of traditional parks.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 社长及主编
    • 期刊荣誉
  • 编委会
    • 主任委员
    • 编委名单
    • 青年编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司