• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
顼佳宇,王晓冰,李冰,顾靖达,张秋实,臧天磊.考虑灵活性资源配置的配电网光伏承载力评估方法[J].电测与仪表,2025,62(2):143-153.
XU Jiayu,WANG Xiaobing,LI Bing,GU Jingda,ZHANG Qiushi,ZANG Tianlei.Distributed PV hosting capacity assessment method for distribution networkconsidering planning of flexible resource[J].Electrical Measurement & Instrumentation,2025,62(2):143-153.
考虑灵活性资源配置的配电网光伏承载力评估方法
Distributed PV hosting capacity assessment method for distribution networkconsidering planning of flexible resource
DOI:10.19753/j.issn1001-1390.2025.02.018
中文关键词:  灵活性资源  光伏承载力  时序相关性  双层模型  智能软开关
英文关键词:flexible resource, PV hosting capacity, time-sequence correlation, bi-level model, soft open point
基金项目:国家自然科学基金项目(52377115);国网北京市电力公司科技项目(520234240004)
                 
作者中文名作者英文名单位
顼佳宇XU Jiayu国网北京市电力公司
王晓冰WANG Xiaobing国网北京市电力公司
李冰LI Bing中国国际工程咨询有限公司
顾靖达GU Jingda国网北京市电力公司
张秋实ZHANG Qiushi四川大学 电气工程学院
臧天磊ZANG Tianlei四川大学 电气工程学院
摘要点击次数: 388
中文摘要:
      在配电网分布式光伏接入容量持续增长的背景下,灵活性资源的合理规划和调用是促进光伏高效消纳的关键。为此,提出一种综合考虑节点型和网络型灵活性配置的配电网光伏承载力评估方法。首先,在传统多场景构建方法基础上,引入时序相关性概念,建立了考虑时序自相关性和互相关性的源荷联合运行场景集。然后,构建了上层光伏承载力评估、下层灵活性资源配置的双层优化模型。上层模型以光伏接入容量最大化为目标,下层模型考虑配电网灵活性运行约束以促进对分布式光伏的高效消纳。通过迭代求解双层模型,最终得到配电网光伏承载力的最大评估结果和灵活性资源的最优配置方案。最后,算例分析表明,节点资源支撑和网络通道支援的相互配合,显著提升了配电网的光伏承载力和运行灵活性。
英文摘要:
      In the context of the continuous growth of distributed photovoltaic(PV) access capacity of the distribution network, the reasonable planning and invocation of flexible resource is the key to promote the efficient absorption of PV. This paper presents an evaluation method of PV hosting capacity of distribution network considering both node type and network type flexible configuration. Firstly, based on the traditional multi-scenario construction method, the concept of time-sequence correlation is introduced establish the joint scenario set of source and load considering time sequence autocorrelation and cross-correlation. Then, the bi-level optimization model of upper PV hosting capacity evaluation and lower flexible resource allocation is constructed. The upper model aims to maximize the PV access capacity, while the lower model considers the flexible operation constraints of the distribution network to promote the efficient absorption of PV. By solving the bi-level model iteratively, the maximum evaluation result of PV hosting capacity and the optimal allocation scheme of flexible resources are obtained. Finally, the simulation analysis shows that the cooperation of node resource and network channel significantly improves the PV hosting capacity and operational flexibility of the distribution network.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 历任主编
    • 期刊荣誉
  • 编委会
    • 社长及主编
    • 主任委员
    • 编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司