• 设为首页
  • 加入收藏
  • 联系邮箱
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 社长及主编
    • 期刊荣誉
  • 编委会
    • 主任委员
    • 编委名单
    • 青年编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
  • English
站内检索    
 
安大炜,李靖,黄译莹,涂园园,何珉.基于二层规划的新型电力系统配电网优化调度方法[J].电测与仪表,2026,63(6):62-72.
An Dawei,Li Jing,Huang Yiying,Tu Yuanyuan,He Min.Optimal scheduling method of novel power system distribution network based on bi-level programming[J].Electrical Measurement & Instrumentation,2026,63(6):62-72.
基于二层规划的新型电力系统配电网优化调度方法
Optimal scheduling method of novel power system distribution network based on bi-level programming
DOI:10.19753/j.issn1001-1390.2026.06.007
中文关键词:  二层规划  新型电力系统配电网  优化调度  虚拟电厂集群  随机机会约束规划
英文关键词:bi-level programming, novel power system distribution network, optimal scheduling, virtual power plant cluster, stochastic chance constrained programming
基金项目:国网重庆市电力公司科技项目(522023230004)
              
作者中文名作者英文名单位
安大炜An Dawei国网重庆市电力公司营销服务中心
李靖Li Jing国网重庆市电力公司营销服务中心
黄译莹Huang Yiying重庆广汇供电服务有限责任公司
涂园园Tu Yuanyuan国网重庆市电力公司营销服务中心
何珉He Min国网重庆市电力公司营销服务中心
摘要点击次数: 138
中文摘要:
      为了进一步提升可再生能源利用效率和系统运行经济性,提出一种包含虚拟电厂集群的新型电力系统配电网二层规划优化调度方法。考虑到系统运行不确定性采用随机机会约束规划建模。模型中上层决策者为系统供电可靠性规划模块,决策变量为配电网运行方案以及各个虚拟电厂与配电网之间的交换功率限值,目标函数是最大化概率形式的供电可靠性指标乐观值,计及配网功率平衡约束、网络节点电压偏移约束、支路容量约束、无功补偿约束等必要约束条件。下层决策者为各个虚拟电厂能量管理模块,在满足上层决策者下发的虚拟电厂集群交换功率限值的前提下制定各子系统内部分布式发电运行计划,最小化运行成本。最后基于IEEE33节点系统构造了一个含虚拟电厂集群的新型电力系统配电网,并对该系统运行所建立的模型,验证了所提出模型能够在保障系统安全稳定运行的前提下最小化运行成本。
英文摘要:
      In order to further improve the utilization efficiency of renewable energy and the economy of system operation, a bi-level programming optimal scheduling method for novel power system distribution network including virtual power plant cluster is proposed. Considering the uncertainty of system operation, stochastic chance constrained programming is used to model. The upper decision maker in the model is the system power supply reliability planning module. The decision variables are the distribution network operation scheme and the exchange power limit between each virtual power plant and the distribution network. The objective function is to maximize the optimistic value of the power supply reliability index in the form of probability, taking into account the necessary constraints such as distribution network power balance constraints, network node voltage offset constraints, branch capacity constraints, and reactive power compensation constraints. The lower decision-maker formulates the distributed generation operation plan for each subsystem under the premise of satisfying the exchange power limit of the virtual power plant cluster issued by the upper decision-maker for each virtual power plant energy management module, and minimizes the operation cost. Finally, based on the IEEE33 node system, a novel power system distribution network with virtual power plant cluster is constructed, and the model of the system operation is established. It is verified that the proposed model can minimize the operation cost under the premise of ensuring the safe and stable operation of the system.
查看全文  查看/发表评论  下载PDF阅读器
关闭
  • 哈尔滨电工仪表研究所有限公司
  • 中国电工仪器仪表信息网
  • 中国仪器仪表学会
  • 中华人民共和国新闻出版总署
  • 中国科技期刊编辑学会
  • 黑龙江省科学技术协会
  • 编辑之家
  • 中国知网
  • 万方数据库
  • 维普网
  • 北极星电力网
  • 中华中控网
  • 网站首页
  • 期刊介绍
    • 期刊简介
    • 社长及主编
    • 期刊荣誉
  • 编委会
    • 主任委员
    • 编委名单
    • 青年编委名单
  • 投稿指南
    • 作者须知
    • 投稿步骤
    • 范文(规范细则)
    • 稿件处理流程
    • 著作权转让协议
  • 期刊影响力
  • 开放获取
  • 出版道德政策
    • 出版伦理声明
    • 学术不端认定和处理方法
    • 广告及市场推广
    • 同行评议流程
    • 斟误和撤回
    • 回避制度
    • 文章署名及版权转让
  • 历年目次
  • 联系我们
地址:哈尔滨市松北区创新路2000号    邮编:150028
邮箱:dcyb@vip.163.com    电话:0451-86611021;87186023
© 2012 电测与仪表    哈公网监备2301003445号
黑ICP备11006624号-1
技术支持:北京勤云科技发展有限公司