• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
一种电压暂降监测装置优化配置的方法
A KIND OF METHOD FOR OPTIMAL PLACEMENT OF VOLTAGE SAG MONITORS
Received:August 27, 2013  Revised:August 27, 2013
DOI:
中文关键词: 优化配置,电压暂降,监测到达域,监测到达矩阵
英文关键词: Optimal placement, voltage sag, Monitor reach area, Monitor reach matrix
基金项目:
Author NameAffiliationE-mail
Liu Jing-yuan* Electric power research institue of Nei meng-gu eastern power corporation,Inner Mongolia Hohhot 010000 453786800@qq.com 
Liu Wei-ming Electric power research institue of Nei meng-gu eastern power corporation,Inner Mongolia Hohhot 010000  
Li xiu Electric power research institue of Nei meng-gu eastern power corporation,Inner Mongolia Hohhot 010000  
Zhang wei Electric power research institue of Nei meng-gu eastern power corporation,Inner Mongolia Hohhot 010000  
Hits: 1497
Download times: 813
中文摘要:
      提出了一种基于监测到达矩阵实现电压暂降监测装置优化配置的方法。结合监测到达域和二进制规则建立监测到达矩阵,作为全网重要节点电压暂降可监测的约束条件。以电压暂降监测装置数目最少为目标函数,建立优化模型,通过求解优化模型实现电压暂降监测装置的优化配置。系统中由各种短路故障引起的电压暂降事件都能被至少其中一台监测装置所捕获。算例分析验证了本文方法的准确性和实用性。
英文摘要:
      Proposed an optimal allocation method based on monitor reach matrix. Combining monitoring reach domain with the binary rules to establish monitor reach matrix, as a constraint conditions that the important nodes of all the system can be monitored. Make the least monitoring device number as the objective function, achieve the optimized configuration of the voltage sag monitoring device through the optimization algorithm with a minimum number of monitoring devices to ensure that the whole network important node’s voltage sag is observable. The voltage sag caused by all kinds of short circuit fault in the system can be captured by at least one monitoring device. Examples verify the effectiveness and practicality of the method.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd