• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
图论在变电站风险评估中的应用
The Applications of Graph Theory to the Risk Assessment of Substation Arrangements
Received:March 10, 2014  Revised:March 10, 2014
DOI:
中文关键词: 变电站  图论  风险  评估
英文关键词: substation  graph theory  risk  arrangement
基金项目:
Author NameAffiliationE-mail
xieyimiao* NanChang university 349320907@qq.com 
zhangzhonghui NanChang university  
wanghui NanChang University  
Hits: 1848
Download times: 1087
中文摘要:
      变电站作为不同电压等级之间的联络枢纽,承担着不同电压等级间能量交换的重要功能,对变电站主接线进行风险评估逐渐成为研究的热点。首先,提出了使用图论可达矩阵识别连通性的方法,将变电站风险评估转化成了变电站内部负荷点与电源点的连通性识别问题;其次,考虑变电站事件发生的随机性,使用Monte Carlo方法抽取了变电站的系统状态,通过修改每一个系统状态的邻接矩阵,计算形成相应的可达矩阵,由此判断变电站是否失负荷;最后,结合风险理论计算了变电站风险。算例的仿真结果表明该方法的正确性和有效性。
英文摘要:
      Substation as a connection hub between the different voltage levels, which bearing the important functions of energy exchange, and it is becoming a research hotspot to assess the risk of substation. Firstly, proposed a method using the reachability matrix of graph theory to recognize connectivity, which make the problem of risk assessment of substation converted into a problem to discern the connectivity of load point and power supply point; Secondly, using the Monte Carlo method to extract the substation system state which considering the randomness of substation event ,then get the reachability matrix by modified the system state of each adjacency matrix,which judge whether the substation will loss load or not; Finally, combine with risk theory calculate the risk of substation. Simulation results of example show the validity and efficiency of method.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd