• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
兴安直流系统的紧急直流功率回降参数研究
Parameter Studying of Xing’an System for Emergency Power Downhill
Received:June 03, 2014  Revised:June 03, 2014
DOI:
中文关键词: 最后断路器跳闸  直流紧急闭锁  兴安直流  功率回降  自耦变过载
英文关键词: The last breaker trip  DC ESOF  Xing’an DC system  Power downhill  Autotransformer overload
基金项目:国家自然科学基金重点项目(51037003),国家电网公司大电网重大专项资助项目课题(SGCC-MPLG027-2012),南方电网超高压检修中心项目资助。
Author NameAffiliationE-mail
LIN Qiao* School of Electrical Engineering and Information,Sichuan University linqiao19890820@sina.cn 
LI Xing-yuan School of Electrical Engineering and Information,Sichuan University  
LI Kuan School of Electrical Engineering and Information,Sichuan University  
HU Nan School of Electrical Engineering and Information,Sichuan University  
Hits: 2239
Download times: 986
中文摘要:
      如果换流站出口的交流线路由于各种原因被切除,导致交流系统因甩负荷将而引起最后断路器跳闸,系统稳定性将受到严重威胁。由此系统将采取一系列保护措施,如直流紧急闭锁(Emergency Switch Off,ESOF)等,这对已损失多条交流线路的负荷区域的供电将是更大的影响,为最大化满足负荷的需求,本文考虑当宝安换流站出口的500kV线路退出时,修改最后线路保护使其不发ESOF,利用4台自耦变所带的220kV线路继续安全稳定供电,为维持系统稳定和避免自耦变过载,让兴安直流适量进行降功率运行。整定分析了兴安直流回降时的几个关键参数(回降数量、时间、速度)以及无功补偿切除量对自耦变的过载影响,经多次试验得出了最佳控制策略,为实际运行提供了基础数据和技术依据,对系统运行有一定指导意义。
英文摘要:
      If the AC lines of the convertor are removed due to various reasons, then the load shedding of AC system at convertor station side will cause the last breaker to trip, after a while a series of protective measures will be taken, such as DC ESOF. Such action increased the influence to the load area which had lost power supply from the AC lines. The system maybe facing the unstable situation when the 500kV line connected to Bao’an convertor station been cut, we utilize the 220kV lines which connected to autotransformer keep powering to the load area. We also set the power downhill parameter of Xing’an DC system and the number of reactive compensation need to remove in order to avoid the autotransformer overload. Through a series of experiments we obtained the optimum parameters which can offer basic data and technological basis for the design of practical engineering.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd